BLD07-02877
| BLD-Aging Inspection | 8/13/2015 | 8/13/2015 | 8/20/2015 10:47:46 AM | | CANC |
|
|
|
BLD12-01449
| BLD-Final | 8/13/2015 | 8/13/2015 | 8/13/2015 3:34:25 PM | P | NR |
|
|
Greg Phone #: ###-#### Need Zoning final and...........?
|
GCB14-00099
| GCB-Framing | 8/13/2015 | 8/13/2015 | 8/13/2015 3:27:32 PM | P | PASS |
|
|
Gary ###-#### - 3rd floor S. wing
|
GCB14-00099
| GCB-Energy | 8/13/2015 | 8/13/2015 | 8/13/2015 3:26:45 PM | P | PART |
|
|
Gary ###-#### - 2nd Floor......Wing parrallel with 42nd St. OK.
|
BLD15-00365
| BLD-Final | 8/12/2015 | 8/13/2015 | 8/13/2015 3:21:19 PM | A | PASS |
|
|
Clearance Phone #: ###-####
|
BLD15-00365
| DOC - Permit Finaled | 8/13/2015 | 8/13/2015 | 8/13/2015 3:20:52 PM | P | PASS |
|
|
|
BLD15-01687
| BLD-Framing/Rough-in | 8/12/2015 | 8/13/2015 | 8/13/2015 3:13:33 PM | A | PASS |
|
|
Clarence Phone #: ###-####
|
BLD15-01168
| BLD-Other | 8/12/2015 | 8/13/2015 | 8/13/2015 12:16:57 PM | A | DONE |
|
|
What is the process to have one hour WUI inspected to confirm lighting boxes and sheetrock install properly? I do not see a specific inspection for this? Please educate me. Phone #: ###-#### Inspection requested via web by Andrew George Exterior OK to cover. can lights OK WUI
|
BLD14-03259
| BLD-Framing/Rough-in | 8/13/2015 | 8/13/2015 | 8/13/2015 12:14:34 PM | A | PART |
|
|
Phase 2.1 framing rough in. Need ok to cover. Phone #: ###-#### Inspection requested via web by Brandon Juarez
|