Inspections for the day of: Thursday, August 13, 2015.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE15-02363 Final8/11/20158/13/20158/13/2015 2:25:34 PMPPASS
Panel is labeled and the UL sticker is inside the hot tub. Phone #: ###-#### Inspection requested via web by Craig Korell ok cover u/g, ok final
ELE14-02371 Final8/12/20158/13/20158/13/2015 2:15:51 PMPCANC
G 1st floor corridor ceiling hard lid G151 Phone #: ###-#### Inspection requested via web by Fabian Luna see ri for G151, not a final yet
ELE14-02371 Electrical Rough-In8/13/20158/13/20158/13/2015 2:11:56 PMPPASS
ok cover G151 hard lid in G 1st floor
ELE15-02096 Electrical Rough-In8/13/20158/13/20158/13/2015 2:07:08 PMPPASS
Trench insp for new water feature. Thank you Phone #: ###-#### Inspection requested via web by Eric Brown ok cover u/g
ELE14-01066 Electrical Rough-In8/12/20158/13/20158/13/2015 1:27:24 PMPPASS
H361 exam H362 toilet H364 storage ceiling lids Phone #: ###-#### Inspection requested via web by Fabian Luna ok cover as requested
ELE14-01814 Final8/12/20158/13/20158/13/2015 12:36:46 PMPPART
Final for D 2nd floor units rough in elevator lobby PE2 Phone #: ###-#### Inspection requested via web by Fabian Luna ok partial, 6 rooms, ok as requested to cover
ELE15-02543 Final8/13/20158/13/20158/13/2015 11:50:35 AMPCANC
Please give me half an hour notice so that I can meet you at this job. Phone #: ###-#### >> Inspection requested via web by Shaun Kirkman Inspection cancelled from web by: Shaun Kirkman
ELE15-02510 Electrical Rough-In8/12/20158/13/20158/13/2015 11:14:19 AMAPASS
Call Steve when in route. Check in with front desk for visitors badge Phone #: ###-#### Inspection requested via web by Steve McCloy north 2nd floor walls only for new offices ok cover
ELE15-01527 Final8/12/20158/13/20158/13/2015 10:37:52 AMAPASS
GARAGE CODE 4224 Phone #: ###-#### Inspection requested via web by Bob Glenn ok final
ELE15-02427 Final8/12/20158/13/20158/13/2015 9:51:04 AMAPASS
We added 5 more panels to the existing array that we installed last year.
There are no changes or additions to the home run wiring or the main service panel wiring. Everything is the same as before, only we connected to top five panels to the string of panels in the back yard. You''ll see the 3/4 conduit exit the upper level eve and over to the original j box under the array.
The lightning ground for thenew panels exits the attic on the far right hand side of the back yard string and down to the original ground and connected.
Thanks guys,
Ryan King Phone #: ###-#### Inspection requested via web by Ryan King ok final
ELE15-02120 Final8/12/20158/13/20158/13/2015 9:09:19 AMAPASS
Any questions please let me know, thx, TW. Phone #: ###-#### Inspection requested via web by Stephen Kren corrections made, ok final
ELE15-01601 Electrical Rough-In8/12/20158/13/20158/13/2015 8:32:21 AMAPASS
Phone #: ###-#### Inspection requested via web by Eric Landberg trailers look ok except some outside gfci don't operate, shall? install covers for outlets and switches, furniture is listed, people will start moving in
ELE15-02529 Final8/12/20158/13/20158/12/2015 2:13:54 PMACANC
Contact on site is Jim Snodgrass. Inspection actually needed on 08/12/15 Phone #: ###-#### >> Inspection requested via web by Todd Sellman Inspection cancelled from web by: Jim Snodgrass