ELE15-02363
| Final | 8/11/2015 | 8/13/2015 | 8/13/2015 2:25:34 PM | P | PASS |
|
|
Panel is labeled and the UL sticker is inside the hot tub. Phone #: ###-#### Inspection requested via web by Craig Korell ok cover u/g, ok final
|
ELE14-02371
| Final | 8/12/2015 | 8/13/2015 | 8/13/2015 2:15:51 PM | P | CANC |
|
|
G 1st floor corridor ceiling hard lid G151 Phone #: ###-#### Inspection requested via web by Fabian Luna see ri for G151, not a final yet
|
ELE14-02371
| Electrical Rough-In | 8/13/2015 | 8/13/2015 | 8/13/2015 2:11:56 PM | P | PASS |
|
|
ok cover G151 hard lid in G 1st floor
|
ELE15-02096
| Electrical Rough-In | 8/13/2015 | 8/13/2015 | 8/13/2015 2:07:08 PM | P | PASS |
|
|
Trench insp for new water feature. Thank you Phone #: ###-#### Inspection requested via web by Eric Brown ok cover u/g
|
ELE14-01066
| Electrical Rough-In | 8/12/2015 | 8/13/2015 | 8/13/2015 1:27:24 PM | P | PASS |
|
|
H361 exam H362 toilet H364 storage ceiling lids Phone #: ###-#### Inspection requested via web by Fabian Luna ok cover as requested
|
ELE14-01814
| Final | 8/12/2015 | 8/13/2015 | 8/13/2015 12:36:46 PM | P | PART |
|
|
Final for D 2nd floor units rough in elevator lobby PE2 Phone #: ###-#### Inspection requested via web by Fabian Luna ok partial, 6 rooms, ok as requested to cover
|
ELE15-02543
| Final | 8/13/2015 | 8/13/2015 | 8/13/2015 11:50:35 AM | P | CANC |
|
|
Please give me half an hour notice so that I can meet you at this job. Phone #: ###-#### >> Inspection requested via web by Shaun Kirkman Inspection cancelled from web by: Shaun Kirkman
|
ELE15-02510
| Electrical Rough-In | 8/12/2015 | 8/13/2015 | 8/13/2015 11:14:19 AM | A | PASS |
|
|
Call Steve when in route. Check in with front desk for visitors badge Phone #: ###-#### Inspection requested via web by Steve McCloy north 2nd floor walls only for new offices ok cover
|
ELE15-01527
| Final | 8/12/2015 | 8/13/2015 | 8/13/2015 10:37:52 AM | A | PASS |
|
|
GARAGE CODE 4224 Phone #: ###-#### Inspection requested via web by Bob Glenn ok final
|
ELE15-02427
| Final | 8/12/2015 | 8/13/2015 | 8/13/2015 9:51:04 AM | A | PASS |
|
|
We added 5 more panels to the existing array that we installed last year. There are no changes or additions to the home run wiring or the main service panel wiring. Everything is the same as before, only we connected to top five panels to the string of panels in the back yard. You''ll see the 3/4 conduit exit the upper level eve and over to the original j box under the array. The lightning ground for thenew panels exits the attic on the far right hand side of the back yard string and down to the original ground and connected. Thanks guys, Ryan King Phone #: ###-#### Inspection requested via web by Ryan King ok final
|
ELE15-02120
| Final | 8/12/2015 | 8/13/2015 | 8/13/2015 9:09:19 AM | A | PASS |
|
|
Any questions please let me know, thx, TW. Phone #: ###-#### Inspection requested via web by Stephen Kren corrections made, ok final
|
ELE15-01601
| Electrical Rough-In | 8/12/2015 | 8/13/2015 | 8/13/2015 8:32:21 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Eric Landberg trailers look ok except some outside gfci don't operate, shall? install covers for outlets and switches, furniture is listed, people will start moving in
|
ELE15-02529
| Final | 8/12/2015 | 8/13/2015 | 8/12/2015 2:13:54 PM | A | CANC |
|
|
Contact on site is Jim Snodgrass. Inspection actually needed on 08/12/15 Phone #: ###-#### >> Inspection requested via web by Todd Sellman Inspection cancelled from web by: Jim Snodgrass
|