BLD14-02678
| BLD-Final | 8/5/2015 | 8/7/2015 | | P | |
|
|
Phone #: ###-#### >> Inspection requested via web by sheila fawley
|
BLD15-00669
| BLD-Foundation | 8/11/2015 | 8/13/2015 | 8/13/2015 4:11:42 PM | P | DONE |
|
|
Kevin Phone #: ###-####. Completed in the am.
|
BLD15-02209
| BLD-Wall Bracing | 8/13/2015 | 8/13/2015 | 8/13/2015 3:01:55 PM | P | FAIL |
|
|
Shear // Tod Phone #: ###-####. Noted that exterior weather resistive barrier has been installed. No inspection done. Needs to remove barrier for inspection. Correction notice posted.
|
BLD15-00669
| BLD-Footing | 8/12/2015 | 8/13/2015 | 8/13/2015 11:43:22 AM | A | PART |
|
|
Late morning if possible // Kevin Phone #: ###-####. Work in progress. Special inspector on site. Need to verify that special inspector is ICC certified.
|
BLD15-01424
| BLD-Energy code compliance | 8/12/2015 | 8/13/2015 | 8/13/2015 9:57:00 AM | A | PASS |
|
|
Colby Phone #: ###-####
|
BLD15-01459
| BLD-Energy code compliance | 8/12/2015 | 8/13/2015 | 8/13/2015 9:38:50 AM | A | PASS |
|
|
Energy final and framing corrections Phone #: ###-#### Inspection requested via web by Andrew George. All framing issues corrected. Spoke to darrell degrange to get correct address for associated electrical permit.
|
BLD15-02223
| BLD-Wall Bracing | 8/12/2015 | 8/13/2015 | 8/13/2015 8:58:09 AM | A | PART |
|
|
Nail // Troy Phone #: ###-####. Exterior shear walls on addition are ok to cover. Interior holdowns at existing not yet installed. Verify at framing inspection.
|
BLD14-02879
| BLD-Final | 8/12/2015 | 8/13/2015 | 8/13/2015 8:23:57 AM | A | PASS |
|
|
Braden Phone #: ###-####. Ok per#415.
|
BLD14-02879
| DOC - Permit Finaled | 8/13/2015 | 8/13/2015 | 8/13/2015 8:23:37 AM | P | PASS |
|
|
Already has cert. per braden. zoning has signed off. Ok to final per#415.
|
BLD15-02577
| BLD-Final | 8/11/2015 | 8/13/2015 | 8/13/2015 12:00:00 AM | P | CANC |
|
|
Please call 15 min prior for access - Chris Phone #: ###-####
|
MIS15-00212
| BLD-Conference | 8/13/2015 | 8/13/2015 | | P | |
|
|
|