ELE19-02995
| Electrical Rough-In | 8/12/2019 | 8/13/2019 | 8/13/2019 8:16:35 AM | A | PASS |
|
|
Buildings were inspected by the state up to this point and the RV Building passed final inspection on 8/12/2019, and the Wood shop passed Rough in OK to cover. I was just informed that I should have had the city doing the inspections and not the state, so this is to convert over to city inspections. Both Panels have the state stickers on them. Phone #: ###-#### Inspection requested via web by Dustin Inskeep Rough-in ok cover
|