MIS18-00081
| MIS-Aging Inspection | 8/6/2020 | 8/6/2020 | | | |
|
|
|
MIS19-00101
| MIS-Aging Inspection | 8/11/2020 | 8/11/2020 | | | |
|
|
|
MIS19-00102
| MIS-Aging Inspection | 8/11/2020 | 8/11/2020 | | | |
|
|
|
BLD20-00354
| BLD-Final | 8/13/2020 | 8/13/2020 | 8/13/2020 3:35:09 PM | P | NR |
|
|
screened // Christina Phone #: ###-####
|
BLD20-02123
| BLD-Energy code compliance | 8/13/2020 | 8/13/2020 | 8/13/2020 3:34:52 PM | P | PASS |
|
|
|
BLD20-02635
| BLD-Final | 8/13/2020 | 8/13/2020 | 8/13/2020 3:33:28 PM | P | DONE |
|
|
Inspection on a completed asphalt roofing project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD20-02635
| DOC - Permit Finaled | 8/13/2020 | 8/13/2020 | 8/13/2020 3:33:16 PM | P | PASS |
|
|
roof appears to be complete//no access to back//
|
BLD20-01286
| BLD-Final | 8/12/2020 | 8/13/2020 | 8/13/2020 3:29:01 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD20-01292
| BLD-Final | 8/12/2020 | 8/13/2020 | 8/13/2020 3:28:46 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-04515
| BLD-Final | 8/13/2020 | 8/13/2020 | 8/13/2020 3:25:34 PM | P | PASS |
|
|
Vince */Screened*/ Phone #: ###-####
|
BLD19-04515
| DOC - Permit Finaled | 8/13/2020 | 8/13/2020 | 8/13/2020 3:25:25 PM | P | PASS |
|
|
|
MIS20-00252
| BLD-Conference | 8/13/2020 | 8/13/2020 | 8/13/2020 2:20:03 PM | P | DONE |
|
|
construction kicking up a lot of dust - possible construction without permits Phone #: ###-####//work in area appears to be new subdivision// let the ESC guys know//
|
BLD20-02658
| BLD-Final | 8/13/2020 | 8/13/2020 | 8/13/2020 2:06:31 PM | P | DONE |
|
|
screened // Walter Phone #: ###-####
|
BLD20-02658
| DOC - Permit Finaled | 8/13/2020 | 8/13/2020 | 8/13/2020 2:06:21 PM | P | PASS |
|
|
bath window is tempered//windows appear to be replaced like for like//
|
BLD20-02636
| BLD-Final | 8/13/2020 | 8/13/2020 | 8/13/2020 1:52:05 PM | P | DONE |
|
|
Inspection on a completed asphalt roofing project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD20-02636
| DOC - Permit Finaled | 8/13/2020 | 8/13/2020 | 8/13/2020 1:51:55 PM | P | PASS |
|
|
roof appears to be installed within code and per scope//no access to back//
|
MIS20-00254
| BLD-Conference | 8/13/2020 | 8/13/2020 | 8/13/2020 1:24:52 PM | P | DONE |
|
|
per Brian schedule inspection for Pm today assign to 490//went with Brian mech ins. for garage to office conversion, added mechanical to garage to convert to office//posted CN on garage window to obtain building permit//
|
BLD20-01287
| BLD-Final | 8/12/2020 | 8/13/2020 | 8/13/2020 12:55:25 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD20-01289
| BLD-Final | 8/12/2020 | 8/13/2020 | 8/13/2020 12:55:09 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD20-01290
| BLD-Final | 8/12/2020 | 8/13/2020 | 8/13/2020 12:54:53 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-00534
| BLD-Final | 8/12/2020 | 8/13/2020 | 8/13/2020 12:27:55 PM | A | NR |
|
|
Need a couple hours in the morning. After 10 am inspection preferred Phone #: ###-#### Inspection requested via web by Travis Blackburn
|
BLD20-00871
| BLD-Final | 8/12/2020 | 8/13/2020 | 8/13/2020 11:08:12 AM | A | PASS |
|
|
Call for access -Dan */Screened*/ Vacant building space Phone #: ###-####//per scope project is complete//
|
BLD20-00871
| DOC - Permit Finaled | 8/13/2020 | 8/13/2020 | 8/13/2020 11:07:50 AM | P | PASS |
|
|
complete per scope
|
BLD20-01286
| BLD-Blower Door Test Results | 8/13/2020 | 8/13/2020 | 8/13/2020 10:52:33 AM | A | DONE |
|
|
4.93 ACH 50
|
BLD20-01287
| BLD-Blower Door Test Results | 8/13/2020 | 8/13/2020 | 8/13/2020 10:52:12 AM | A | DONE |
|
|
4.90 ACH 50
|
BLD20-01289
| BLD-Blower Door Test Results | 8/13/2020 | 8/13/2020 | 8/13/2020 10:51:48 AM | A | DONE |
|
|
4.78 ACH 50
|
BLD20-01290
| BLD-Blower Door Test Results | 8/13/2020 | 8/13/2020 | 8/13/2020 10:51:25 AM | A | DONE |
|
|
4,66 ACH 50
|
BLD20-01292
| BLD-Blower Door Test Results | 8/13/2020 | 8/13/2020 | 8/13/2020 10:50:32 AM | A | DONE |
|
|
4.97 ACH 50
|
BLD20-02250
| BLD-Framing/Rough-in | 8/12/2020 | 8/13/2020 | 8/13/2020 9:51:06 AM | A | FAIL |
|
|
Any questions please contact Preston 2085148720. Phone #: ###-#### Inspection requested via web by Preston Reynolds//CN left with plans for framinng corrections, see plans for details//no one onsite//
|
BLD20-01105
| BLD-Energy code compliance | 8/12/2020 | 8/13/2020 | 8/13/2020 9:46:03 AM | A | PASS |
|
|
kevin ###-####//foam and insulation removed from around fireplace vent// verified via virtual inspection via photos//ok to cover//
|
BLD20-02123
| BLD-Energy code compliance | 8/12/2020 | 8/13/2020 | 8/13/2020 9:45:00 AM | A | NR |
|
|
Screened- kent Phone #: ###-####//not ready will move inspection to PM//
|
BLD20-01738
| BLD-Framing/Rough-in | 8/12/2020 | 8/13/2020 | 8/13/2020 9:28:20 AM | A | PART |
|
|
Eric- */Screened*/ Phone #: ###-####//areas previously walked with MEPs passed ok to cover//added studs and ceiling wires verified via photos/virtually//
|
BLD19-04515
| BLD-Final | 8/12/2020 | 8/13/2020 | 8/13/2020 8:54:42 AM | A | NR |
|
|
screened // Vince Phone #: ###-####//need to clean up, street and underfloor//add insulatin to access hatch in bedroom//
|
BLD19-04515
| BLD-Blower Door Test Results | 8/13/2020 | 8/13/2020 | 8/13/2020 8:53:56 AM | A | DONE |
|
|
4.5 ACH 50
|
BLD19-04792
| BLD-Framing/Rough-in | 8/13/2020 | 8/13/2020 | 8/13/2020 7:36:04 AM | A | CANC |
|
|
Bering Points Phone #: ###-#### >> Inspection requested via web by Shane Shade Inspection cancelled from web by: Shane Shade
|
MIS19-00106
| MIS-Aging Inspection | 8/13/2020 | 8/13/2020 | | | |
|
|
|
MIS19-00172
| MIS-Aging Inspection | 8/13/2020 | 8/13/2020 | | | |
|
|
|