PLM00-02169
| Groundwork | 8/11/2000 | 8/14/2000 | 8/14/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 14:02:50. Contact: ###-####. combo w&v by south cent 8/14/2000 11:05:17 AM ral restrooms 8/14/2000 11:05:24 AM
|
PLM00-02869
| Plumbing Rough-in | 8/11/2000 | 8/14/2000 | 8/14/2000 12:00:00 AM | A | FAIL |
|
|
Gene ###-#### plumbing is in the process of a massive remodle 8/14/2000 11:21:22 AM
|
PLM00-02087
| Final | 8/11/2000 | 8/14/2000 | 8/14/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 16:24:31. Contact: ###-####.
|
PLM00-02873
| Plumbing Rough-in | 8/14/2000 | 8/14/2000 | 8/14/2000 12:00:00 AM | P | FAIL |
|
|
ROB-- ###-#### R/I pex within 12" of recessed light, 2" master tub waste backgraded, nailplates required at main water shutoff, no test on 2nd floor waste and vent system, guage on water system test defective, replace and retest 8/14/2000 3:10:55 PM
|
PLM00-01644
| Groundwork | 8/14/2000 | 8/14/2000 | 8/14/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 08:09:43. Contact: ###-####. 3" and 2" wastes east end 8/14/2000 10:14:45 AM
|
PLM00-02874
| Water and/or Sewer | 8/14/2000 | 8/14/2000 | 8/14/2000 12:00:00 AM | P | PASS |
|
|
w/s final ###-####
|
PLM00-02872
| Groundwork | 8/14/2000 | 8/14/2000 | 8/14/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 10:05:58. Contact: ###-####. regrade waste line test ok 8/14/2000 2:42:52 PM
|
PLM00-01621
| Final | 8/14/2000 | 8/14/2000 | 8/14/2000 12:00:00 AM | P | PART |
|
|
###-#### seal floor at sumps, complete subwater drainage exterior, protect PEX at wall penatration above sumps, inadiquate urinal clearance 8/14/2000 1:44:23 PM temp occ ok 8/14/2000 1:44:39 PM
|
PLM00-02876
| Water and/or Sewer | 8/14/2000 | 8/14/2000 | 8/14/2000 12:00:00 AM | P | PASS |
|
|
Brian ###-####
|
PLM00-02864
| Plumbing Rough-in | 8/11/2000 | 8/14/2000 | 8/14/2000 12:00:00 AM | P | PASS |
|
|
###-####
|