BLD01-01181
| BLD-Concrete | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 301 On 8/14/2001 8:24:34 AM c/n made ok rebar ok for colm design and top chord.
|
BLD96-00146
| BLD-Conference | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | FAIL |
|
|
Wayne Berry ###-#### need occ calulation to justafy door swing. 8/14/2001 9:13:25 AM
|
BLD01-01106
| BLD-Framing/Rough-in | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 13:11:51. Contact: ###-####.
|
MEC01-02129
| Rough-in | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 13:33:56. Contact: ###-####.
|
BLD01-01781
| BLD-Foundation | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
###-#### jed walls ok 8/14/2001 9:56:34 AM
|
BLD01-01906
| BLD-Final | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 15:50:21. Contact: ###-####. l/c ok 8/14/2001 11:37:43 AM
|
BLD01-01099
| BLD-Conference | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
RANDY ###-#### FOR CONFERENCE ok to insulate 8/14/2001 11:27:09 AM
|
BLD01-00025
| BLD-Final | 8/10/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
###-#### garage code 0912final per plan.l/c on site 8/14/2001 3:02:32 PM
|
BLD01-01151
| BLD-Final | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | NR |
|
|
KEVIN ###-#### FN
|
BLD01-01780
| BLD-Framing/Rough-in | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
DANA-- ###-#### FOR A SHEAR exterior ok for cover. 8/14/2001 4:55:03 PM
|
BLD01-01996
| BLD-Final | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 09:32:47. Contact: ###-####. card on site final ok. 8/14/2001 4:18:20 PM
|
BLD01-01996
| BLD-Final | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 09:32:47. Contact: ###-####. card on site final ok. 8/14/2001 4:18:20 PM
|
MIS01-00161
| BLD-Conference | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
DEE-- ###-#### FOR FIRE DAMAGE-FOR CONF south 1/2 of roof sys. must be removed north end of roof possable to save with invesagation upon removal of ceilling. bearing walls ok on house/ garage gone. floor 48'' oc beams w/ 2x t&g not a problem for support. common wall at garage only one stud gone need to relocate ele panel in this wall./ egress windows old 48'' sill height. 8/14/2001 3:56:01 PM
|
BLD01-02030
| BLD-Foundation | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
###-#### tod
|
BLD01-00983
| BLD-Framing/Rough-in | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 10:22:01. Contact: ###-####. egress window in bedroom/fire blk unusable space/ cover foam board in attic space air seal. 8/15/2001 4:31:44 PM
|
BLD01-01101
| BLD-Framing/Rough-in | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 10:47:21. Contact: ###-####.
|
BLD01-01893
| BLD-Footing | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PART |
|
|
###-#### house ft only wip outside boards set. 8/14/2001 3:17:13 PM
|