BLD00-01649
| BLD-Framing/Rough-in | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PART |
|
|
mil ###-####, kee 8/14/2001 11:37:52 AM p c/n ISI to provide details as req'd 8/14/2001 11:38:18 AM
|
BLD01-01469
| BLD-Concrete | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PART |
|
|
Bob ###-#### panels look good, pending insp report 8/14/2001 4:02:10 PM
|
BLD99-03277
| BLD-Final | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | NR |
|
|
gerald ###-#### please call maintence has key...getting sigs; fire ok per Rick J 8/14/2001 10:00:30 AM
|
BLD00-03449
| BLD-Framing/Rough-in | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PART |
|
|
structural steel John ###-####; deck, studs in place ok, pend MTI report. 8/14/2001 10:31:25 AM
|
BLD01-01535
| BLD-Final | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-00170
| BLD-Conference | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 8/14/2001 8:28:54 AM re insps & final for rest rms.
|
BLD01-01478
| BLD-Foundation | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 09:11:07. Contact: ###-####.
|
BLD00-03449
| BLD-Conference | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 8/14/2001 9:46:43 AM w/ John Schultz...need all spec insp reports...
|
BLD00-00081
| BLD-Conference | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 8/14/2001 10:34:46 AM w/ St Lukes; revised spec insp reports rec'd...(permit #s were incorrect on some ); final MTI affidavit re west wing stair is mentioned, but not rec'd at this time
|
BLD00-02394
| BLD-Conference | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 8/14/2001 10:39:36 AM still need all mti & eng's affidavits. wip
|
BLD01-00176
| BLD-Framing/Rough-in | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 8/14/2001 11:27:23 AM bsmt rest-rms ok to use; adjacent lid & walls subject to subsequent demo.
|
BLD01-00186
| BLD-Conference | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 8/14/2001 11:37:27 AM w/ Dave...still need steel certs, masonry & apprropriate concrete reports
|
BLD01-02088
| BLD-Footing | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 8/14/2001 4:32:17 PM w/ concrete contractor ...re plans, no hd's shown, added by bldr. ok
|
BLD98-03343
| BLD-Final | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
Tim Wilcomb, ###-#### - all items are now finished - reinspect; c/n ok...ok for c/o 8/16/2001 10:55:48 AM
|
BLD00-03729
| BLD-Framing/Rough-in | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PART |
|
|
Bruce ###-#### activity rm lid at bsmt ok 8/14/2001 1:29:46 PM
|
BLD00-02793
| BLD-Framing/Rough-in | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PART |
|
|
###-#### rick; grid at rear dining area ok pend elec & hvac 8/14/2001 2:42:51 PM
|
BLD01-02191
| BLD-Foundation | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PART |
|
|
###-####; no plan, looks ok, hold downs in; poured 8/14/2001 4:05:05 PM
|
BLD00-03721
| BLD-Conference | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | CANC |
|
|
###-#### jack canc
|
BLD00-03594
| BLD-Final | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | FAIL |
|
|
###-#### dan c/n re stair rails; ok for t/o. 8/14/2001 1:32:39 PM
|
BLD01-01792
| BLD-Framing/Rough-in | 8/10/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
16th floor ###-#### Todd ** ###-#### Terry; ok to cover, chk doors per plan at fi 8/14/2001 2:10:41 PM nal as is considered a separate space,not expansion. 8/14/2001 2:11:19 PM
|