ELE01-02496
| Electrical Rough-In | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PART |
|
|
MARK ###-#### R/I. DEON. sub-basemnt, basemnt, 1st thru 3rd floors branch circuit r/i. 8/14/2001 9:16:25 AM
|
ELE01-01606
| Final | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 14:02:23. Contact: ###-####. completed. 8/14/2001 9:49:38 AM
|
ELE01-00145
| Final | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
FN INSP- BRAD ###-####. completed. 8/14/2001 2:27:44 PM
|
ELE01-02685
| Electrical Rough-In | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 16:28:07. Contact: ###-####. unfused conductors inside building; called contractor, will make corrections. 8/14/2001 10:23:24 AM
|
ELE01-02762
| Electrical Rough-In | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 07:03:31. Contact: ###-####. installed sub-panel in basement; kitchen remodel. 8/14/2001 11:07:32 AM
|
ELE01-02597
| Rough-In Permanent Service | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
utility, room entry and service emmett ###-####. perm/svc.
p/s ug n traditional ele #2597-ok 8/14/2001 2:08:44 PM
|
ELE01-02614
| Electrical Rough-In | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PART |
|
|
###-#### call first and this inspection is for the 1st floor. atm room walls and ceiling r/i. 8/14/2001 3:46:12 PM
|
ELE01-02675
| Final | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 09:18:36. Contact: ###-####. ceiling r/i. 8/14/2001 3:14:56 PM
|
ELE00-03455
| Electrical Rough-In | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PART |
|
|
###-####. ok to insulate; pvc conduit needs secured, switches shall be grounded. 8/14/2001 4:34:56 PM
|
ELE01-02675
| Final | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 403 On 8/14/2001 3:17:38 PM completed.
|
ELE01-01921
| Electrical Rough-In | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 15:45:17. Contact: ###-####. ceiling r/i, 8/14/2001 2:43:15 PM
|