MEC01-01796
| Rough-in | 8/10/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
R/I ###-#### RE-INSP- JOHN
|
MEC01-02298
| Pressure Test | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
PRES TEST SAM ###-#### -KEY ABOVE FRONT DOOR
|
MEC01-02392
| Final | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
p/t and range Jeff ###-####
|
MEC01-01646
| Final | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 12:33:17. Contact: ###-####.
|
MEC01-02409
| Final | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | FAIL |
|
|
###-#### JAN FN ....###-#### 8/14/2001 8:17:58 AM need comb air 8/14/2001 8:59:36 AM
|
MEC01-02415
| Rough-in | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | FAIL |
|
|
LATE AM TODD --###-#### posted corr..tried to call todd..no answer 8/14/2001 9:28:57 AM
|
MEC01-02416
| Rough-in | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | FAIL |
|
|
TODD- ###-#### -LATE AM IF POSSIBLE ???R/I posted corr..tried to call todd..no answer 8/14/2001 9:29:19 AM
|
MEC01-01938
| Rough-in | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 09:04:33. Contact: ###-####.
fireplace
|
MEC01-02410
| Pressure Test | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 09:54:24. Contact: ###-####.... 8/14/2001 1:48:20 PM
|
MEC01-01299
| Rough-in | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 10:27:27. Contact: ###-####.
|
MEC01-02394
| Pressure Test | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
RE-INSP-- ###-#### PRES TEST
|
MEC01-00346
| Final | 8/9/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 16:10:12. Contact: ###-####.
|