BLD01-01296
| BLD-Framing/Rough-in | 8/9/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PART |
|
|
shear ###-####
shear ok 8/14/2001 12:29:18 PM
|
BLD01-01285
| BLD-Framing/Rough-in | 8/10/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PART |
|
|
SHEAR INSP - GRANT- ###-####
exterior shear ok 8/14/2001 2:20:28 PM
|
MIS01-00158
| BLD-Conference | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
Rehab request for housing code. Contact Lois @ ###-#### for access.
left original and copy w/ owner, kept one copy 8/14/2001 3:17:37 PM
|
BLD01-00998
| BLD-Energy code compliance | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PART |
|
|
###-#### Matt
upper floor framing and insulation ok 8/14/2001 2:21:13 PM
|
BLD01-01423
| BLD-Concrete | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PART |
|
|
part of masonary parapet wall, wip, ok w/ verbal corrections, also other items on conf., 1 hr walls, ceilings, draft stops etc. 8/14/2001 12:26:30 PM
|
BLD01-02142
| BLD-Foundation | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PART |
|
|
Allen ###-####
|
BLD01-00171
| BLD-Conference | 8/13/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 16:02:39. Contact: ###-####.
conf. on final, temp. occ., ada reqmts., etc. 8/14/2001 12:28:57 PM
|
BLD01-02054
| BLD-Energy code compliance | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PART |
|
|
###-#### troy
slab insulation ok 8/15/2001 10:07:17 AM
|
BLD01-00919
| BLD-Framing/Rough-in | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | PASS |
|
|
###-####
shear ok per struct. eng. verbal// c/n made ok
ok to insulate 8/14/2001 3:50:10 PM
|
BLD01-00798
| BLD-Final | 8/14/2001 | 8/14/2001 | 8/14/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 11:29:26. Contact: ###-####.
|