Inspections for the day of: Wednesday, August 14, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00018 BLD-Framing/Rough-in8/13/20028/14/20028/14/2002 12:00:00 AMAPART
###-#### SCOTT ceiling grid ok to drop in panels 8/14/2002 10:12:56 AM
BLD02-00713 BLD-Framing/Rough-in8/13/20028/14/20028/14/2002 12:00:00 AMAFAIL
###-#### shear fail partly covered no blocking also one hour fire walls siding will be removed on fire walls so shear can be done and sheet rock installed also no draft stops no truss engineering no framing inspection done at this time told contractor not to cover any thing and when to schd inspections 8/14/2002 9:32:22 AM
BLD01-01109 BLD-Final8/13/20028/14/20028/14/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/13/2002 at 15:45:46. Contact: ###-####.ok for temp occ entry area only 8/14/2002 11:15:38 AM
BLD02-01237 BLD-Footing8/13/20028/14/20028/14/2002 12:00:00 AMAPART
###-#### work in progress set backs ok ground ok tjis is the garage addn 8/14/2002 9:49:20 AM
MIS02-00193 BLD-Final8/13/20028/14/20028/14/2002 12:00:00 AMANH
Delbert (Del) Leslie
Phone #: H###-####
PLEASE CALL THIS ###-#### WHEN GOING GOING ABOUT 10 MINS.
Please schedule this inspection for Tuesday 8/13/2002 in the AM--
**Please make a note for the inspector: If possible please do this inspection early in the morning, Thank you. Leave the inspection with the homeowner or drop off at 1025 S Capitol Blvd.
BLD02-01228 BLD-Framing/Rough-in8/14/20028/14/20028/14/2002 12:00:00 AMPNR
###-#### harold needs elec r/i needs shear finished also becouse they moved a door they need to add three hold downs no inspection done at this time 8/14/2002 2:57:38 PM
BLD02-00822 BLD-Framing/Rough-in8/14/20028/14/20028/14/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/14/2002 at 08:25:34. Contact: ###-####.c/n item #5 engineer reveiwed roof needs add suport and item#4 tji connections still need A35 clips 8/14/2002 1:52:58 PM
BLD02-00751 BLD-Footing8/14/20028/14/20028/14/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/14/2002 at 10:09:27. Contact: ###-####. done by mti 8/14/2002 4:38:36 PM
BLD02-01572 BLD-Framing/Rough-in8/14/20028/14/20028/14/2002 12:00:00 AMPPART
the later the better ###-#### shear ok to cover ext 8/14/2002 3:16:45 PM
MIS02-00193 BLD-Final8/14/20028/14/20028/14/2002 12:00:00 AMPPASS
Delbert (Del) Leslie
Phone #: H###-####
PLEASE CALL THIS ####-#### BEFORE GOING OUT ABOUT 10 MINS.
Please schedule this inspection for Tuesday 8/13/2002 in the AM--
**Please make a note for the inspector: If possible please do this inspection early in the morning, Thank you. Leave the inspection with the homeowner or drop off at 1025 S Capitol Blvd.
BLD02-01238 BLD-Final8/7/20028/14/20028/14/2002 12:00:00 AMPPART
VAL; Phone #: ###-#### ok for temp occ c/n on site 8/14/2002 4:06:34 PM