MIS03-00053
| FIR-Final | 8/13/2003 | 8/14/2003 | 8/14/2003 12:00:00 AM | P | PASS |
|
|
###-#### christina no paperwork to sign off for final; occupancy okay 8/14/2003 10:31:04 AM
|
BLD03-01703
| FIRE-Final Inspection | 8/13/2003 | 8/14/2003 | 8/14/2003 12:00:00 AM | P | PASS |
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore column protection not needed; shelves not installed as this is for pallet storage 8/14/2003 8:34:29 AM
|
BLD02-02623
| FIRE-Final Inspection | 8/14/2003 | 8/14/2003 | 8/14/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/14/2003 at 7:40:12 AM. Contact: ###-####. per Mike Otto the basement is going to have a separate permit - occupancy is approved for the first floor only 8/14/2003 3:38:59 PM
|
BLD03-01899
| FIRE-Final Inspection | 8/14/2003 | 8/14/2003 | 8/14/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/14/2003 at 8:31:39 AM. Contact: ###-####.
|