BLD06-01174
| FIRE-Final Inspection | 8/14/2006 | 8/14/2006 | 8/14/2006 5:08:54 PM | P | FAIL |
|
|
Testing today was for the exit signs and emergency lights for all areas south of the mountain which passed.
|
FIR06-00419
| INSP-Alarm Testing | 8/14/2006 | 8/14/2006 | 8/14/2006 5:07:30 PM | P | DONE |
|
|
Duct detector testing passed today.
|
FIR05-00816
| INSP-Final Inspection | 8/14/2006 | 8/14/2006 | 8/14/2006 3:36:46 PM | P | PASS |
|
|
permit finaled
|
FIR05-00586
| INSP-Final Inspection | 8/10/2006 | 8/14/2006 | 8/14/2006 3:36:15 PM | A | FAIL |
|
|
Remove the switch for the air compressor and straighten the dry pendant as discussed. (This activity was added in error so we have changed the case status back to Issued.)
|
FIR05-00536
| INSP-Sprinkler Rough-in | 8/11/2006 | 8/14/2006 | 8/14/2006 1:26:32 PM | A | PASS |
|
|
Third floor rough-in passed. Still need to have the arm overs inspected before coverup.
|
FIR05-00693
| INSP-Sprinkler Rough-in | 8/11/2006 | 8/14/2006 | 8/14/2006 11:45:32 AM | A | PASS |
|
|
The east second floor elevator lobby piping is ok to cover and the west second floor stairway piping is ok to cover.
|
FIR06-00213
| INSP-Sprinkler Rough-in/Hydro | 8/11/2006 | 8/14/2006 | 8/14/2006 10:23:19 AM | A | DONE |
|
|
Began the 24 hour air test at 10:00am. The left system is at 41psi and the right system is at 40 psi.
|