FIR07-00337
| FIR-Aging Inspection | 8/14/2007 | 8/14/2007 | 8/15/2007 1:06:42 PM | | NR |
|
|
work is in progress
|
BLD07-00271
| FIRE-Final Inspection | 8/13/2007 | 8/14/2007 | 8/14/2007 4:51:11 PM | P | FAIL |
|
|
See the front page of the building plans for a list of life safety corrections required. They include door hardware, exit signs/emergency light testing, exit discharge lighting repairs
|
FIR07-00490
| INSP-Final Inspection | 8/13/2007 | 8/14/2007 | 8/14/2007 3:57:20 PM | P | FAIL |
|
|
See the front sheet of the city approved plans for the items that need correcting.
|
FIR05-00536
| INSP-Sprinkler Rough-in | 8/14/2007 | 8/14/2007 | 8/14/2007 3:52:02 PM | P | FAIL |
|
|
The piping layout in the existing areas does not match the approved plans. Starter pieces are shown as 1" where as the actual piping has 1 1/4" piping. There are branchlines where none are shown. Plans need to be resubmitted to reflect the actual conditions.
|
FIR07-00479
| INSP-Sprinkler Rough-in | 8/14/2007 | 8/14/2007 | 8/14/2007 2:46:29 PM | P | PASS |
|
|
The sprinkler piping in the CEO corridor and the adjacent offices is ok to cover.
|
FIR07-00646
| INSP-Sprinkler Rough-in | 8/9/2007 | 8/14/2007 | 8/14/2007 1:28:37 PM | A | PASS |
|
|
The sprinkler piping is ok to cover. This inspection took two trips due to the first inspection I found the hanger attachments not correct. They have been corrected on the second inspection of the day.
|
FIR07-00244
| INSP-Final Inspection | 8/13/2007 | 8/14/2007 | 8/14/2007 11:50:05 AM | A | PASS |
|
|
Permit is finaled.
|
FIR07-00614
| INSP-Final Inspection | 8/13/2007 | 8/14/2007 | 8/14/2007 11:24:40 AM | A | FAIL |
|
|
The plans do not match the installation and per Chris the fitter as-builts are being submitted. The biggest issue is multiple heads off of 1" outlets. This is not allowed and is stated as such on the review comments in red.
|
FIR07-00668
| INSP-Final Inspection | 8/13/2007 | 8/14/2007 | 8/13/2007 1:50:22 PM | A | PASS |
|
|
Permit finaled
|