FIR08-00077
| INSP-Sprinkler Rough-in/Hydro | 8/14/2008 | 8/14/2008 | 8/15/2008 3:51:29 PM | P | PASS |
|
|
Aboveground and Under ground Hydro tests passed.
|
FIR08-00163
| INSP-Sprinkler Rough-in/Hydro | 8/14/2008 | 8/14/2008 | 8/14/2008 3:29:42 PM | P | PASS |
|
|
Above ground hydro test passed.
|
FIR08-00164
| INSP-Sprinkler Rough-in/Hydro | 8/14/2008 | 8/14/2008 | 8/14/2008 3:29:17 PM | P | PASS |
|
|
Above ground hydro test passed.
|
FIR08-00434
| INSP-Sprinkler Rough-in/Hydro | 8/13/2008 | 8/14/2008 | 8/14/2008 3:12:55 PM | A | PASS |
|
|
The under ground hydro test passed.
|
BLD08-00360
| FIRE-Final Inspection | 8/13/2008 | 8/14/2008 | 8/14/2008 1:06:02 PM | A | FAIL |
|
|
Provide current certification for the hood suppression system ( currently the appliances will not fit under the hood and are too low), remove the dead bolt from the rear exit door and provide single action hardware as per the approved drawings, provide sprinkler protection in the areas where heads are missing and/or overspaced, replace the painted sprinkler heads, repair and test all exit signs and emergency lights and install additional signage as shown on drawing sheets A1.1 and E1, provide verification that the sprinkler system has had itsw annual inspection, provide fire extinguishers throughout the tenant as per the review comments, post the occupant load sign as per the review comments (193), remove dead bolts from the inactive leaf of the main exit/entrance door, provide verification that the hood suppression system is interconnected with the building fire alarm system.
|
BLD08-00984
| FIRE-Final Inspection | 8/13/2008 | 8/14/2008 | 8/14/2008 1:01:11 PM | A | PART |
|
|
A temporary was given with Sam Rogers permission until the fire alarm permit can be finaled. See the project related fire alarm permit for details. The two exit signs from the previous correction notice have been repaired.
|
FIR08-00413
| INSP-Final Inspection | 8/13/2008 | 8/14/2008 | 8/14/2008 12:59:45 PM | A | PART |
|
|
A temporary occupancy was given with Sam Rogers permission until the revised fire alarm plans showing the additional NAC panel have been approved and a field inspection verifies compliance with the new drawings. I tested the new NAC panel and it functioned correctly.
|
BLD08-00983
| FIRE-Final Inspection | 8/13/2008 | 8/14/2008 | 8/14/2008 11:37:16 AM | A | PASS |
|
|
fire life safety passed
|
FIR08-00077
| INSP-Sprinkler Rough-in/Hydro | 8/13/2008 | 8/14/2008 | 8/14/2008 8:17:17 AM | A | FAIL |
|
|
No access to the riser room. No one on the job site.
|