ESC08-00234
| Random Inspection | 8/14/2008 | 8/14/2008 | 8/14/2008 5:40:40 PM | P | PASS |
|
|
ESC permit sign posted. Noted proper containment for excavagted dirt.
|
BLD08-00622
| BLD-Framing/Rough-in | 8/14/2008 | 8/14/2008 | 8/14/2008 5:40:04 PM | P | PART |
|
|
Ron Phone #: ###-####.. verified anchor bolts in ts column base plates. Told Ron to place non shrink grout unser baseplates prior to placing remaining conc.
|
ESC08-00361
| Random Inspection | 8/14/2008 | 8/14/2008 | 8/14/2008 4:00:32 PM | P | PASS |
|
|
ESC permit sign posted, BMP's in place.
|
BLD08-00890
| BLD-Energy code compliance | 8/14/2008 | 8/14/2008 | 8/14/2008 4:00:00 PM | P | NR |
|
|
Tommy Phone #: ###-####
|
BLD08-00984
| BLD-Final | 8/13/2008 | 8/14/2008 | 8/14/2008 3:11:42 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 8/13/2008 at 3:53:14 PM. Contact: ###-####. ok for temp occ. Needs other trades to sign perm. Also needs to install boots under sinks, install missing safety glazing and finsh transitions on carpet to tile/congoliuem at floor elevation changes.
|
BLD08-01357
| BLD-Other | 8/14/2008 | 8/14/2008 | 8/14/2008 2:10:58 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 8/14/2008 at 8:04:40 AM. Contact: ###-####. Needs to remove screws from clip to main and cross runners, also cmplete install of clips. c/n posted.
|
MIS08-00119
| BLD-Conference | 8/14/2008 | 8/14/2008 | 8/14/2008 1:41:50 PM | P | DONE |
|
|
Working without permits post stop work order per Bob Archibald. A stop work was posted with c/n stating to obtain demo permit.
|
BLD08-00464
| BLD-Footing | 8/13/2008 | 8/14/2008 | 8/14/2008 10:57:16 AM | A | PASS |
|
|
brent Phone #: ###-####Footings for detached garage.
|
ESC08-00175
| Site Preparation | 8/14/2008 | 8/14/2008 | 8/14/2008 10:56:56 AM | A | PASS |
|
|
ESC permit sign posted in front window. BMP's ok.
|
BLD08-01616
| BLD-Final | 8/13/2008 | 8/14/2008 | 8/14/2008 9:34:14 AM | A | PASS |
|
|
Steve Phone #: ###-####
|
BLD08-01616
| DOC - Permit Finaled | 8/14/2008 | 8/14/2008 | 8/14/2008 9:34:06 AM | P | PASS |
|
|
Letter of compliance issued. Verified all signatures.
|