Inspections for the day of: Thursday, August 14, 2008.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00279 Aging Inspection8/14/20088/14/20088/15/2008 1:12:43 PM DEFR
Moved to a site final.
ESC06-00812 Site Final8/14/20088/14/20088/14/2008 3:11:36 PMPPASS
ESC06-00264 Site Final8/14/20088/14/20088/14/2008 3:11:04 PMPPASS
ESC06-01750 Site Final8/14/20088/14/20088/14/2008 3:09:58 PMPPASS
Work is completed.
CAS
ESC06-01090 Site Final8/14/20088/14/20088/14/2008 3:09:03 PMPPASS
ESC06-01753 Site Final8/14/20088/14/20088/14/2008 3:08:26 PMPPASS
Work is completed.
ESC06-01752 Site Final8/14/20088/14/20088/14/2008 3:06:49 PMPPASS
ESC08-00299 Site Preparation8/14/20088/14/20088/14/2008 2:52:37 PMPPASS
ESC08-00333 General Inspection8/14/20088/14/20088/14/2008 2:48:07 PMPPASS
No issues present.

ESC07-01264 BMP Violation8/14/20088/14/20088/14/2008 2:37:39 PMPFAIL
In the south wst area of project next to the access road to the dam, thye slope that are sitting more than 2% need to be either stabilized of have some type of approved sediment barrier installed. Left a message with the RP to contact me to discuss the issues. Will re-inspect on 8/20/08
CAS
ESC08-00297 Site Final8/14/20088/14/20088/14/2008 2:21:24 PMPPASS
All work is complete.
CAS
ESC08-00604 Random Inspection8/14/20088/14/20088/14/2008 2:16:14 PMPCANC
Duplicate
ESC08-00457 General Inspection8/14/20088/14/20088/14/2008 1:51:24 PMPFAIL
Spoke with RP.
1. Stop street washing at the entrance of lot. Clean up all hard surface of sediment.
Will re-inspect on 8/18/08.
ESC08-00400 General Inspection8/14/20088/14/20088/14/2008 11:08:51 AMAPASS
Prior issues have bee corrected. No issues today.
CAS
ESC08-00668 Site Preparation8/13/20088/14/20088/14/2008 10:42:18 AMAPASS
ESC sign posted.
CAS
ESC08-00604 Complaint Inspection8/14/20088/14/20088/14/2008 9:55:57 AMAFAIL
1.Need to protect D.I at the end of the street.
2.Clean up all sediment off of hard surfaces. Will re-inspect on 8/15/08 in the PM.
CAS
ESC08-00461 General Inspection8/14/20088/14/20088/14/2008 9:05:17 AMAFAIL
Spoke with RP over the issues.
1.Stabilize stock piles and earth berms on project.
2. Fill out esc sign again with the proper info pertaining to it.
3. Post ESC sign at the front of the project area next to the entance.
Will re-inspect on 8/20/08.
CAS
ESC08-00349 General Inspection8/14/20088/14/20088/14/2008 8:47:31 AMAPASS
Site looks good. Is kept very clean.
ESC08-00575 Tracking Control8/13/20088/14/20088/14/2008 8:37:03 AMPPART
Have made a temporary entrance in the center of the project. No tracking has occured at this time. Will re-inspect on 8/15/08
CAS