Inspections for the day of: Friday, August 14, 2009.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-00657 BLD-Final8/14/20098/14/20098/14/2009 5:40:32 PMPNR
Need Electr final.
BLD09-00969 BLD-Footing8/14/20098/14/20098/14/2009 4:15:07 PMPPASS
bruce - late afternoon please Phone #: ###-####
No special insp required. OK
ESC09-00360 Site Preparation8/14/20098/14/20098/14/2009 4:14:25 PMPPASS
Removed stockpile from driveway....swept hard surfaces. Allowed for Concr washout area with plastic liner.
ESC09-00423 Site Preparation8/13/20098/14/20098/14/2009 3:35:38 PMPNR
BLD09-01140 BLD-Footing8/12/20098/14/20098/14/2009 3:35:13 PMPNR
Scheduled by a contractor via Hello! on 8/12/2009 at 7:51:53 AM. Contact: ###-####.
BLD09-01197 BLD-Footing8/14/20098/14/20098/14/2009 3:34:46 PMPPASS
request late as possible pm//John Burton ###-####
Verified 20' rebar UFER ground....and 20' stranded copper wire prior to pour.
BLD09-00461 BLD-Conference8/13/20098/14/20098/14/2009 12:42:54 PMADONE
brandon Phone #: ###-####
Inspection of straps at roof deck.....OK. OK to roof.
BLD08-01502 BLD-Framing/Rough-in8/13/20098/14/20098/14/2009 12:41:14 PMAPASS
Mitch Phone #: ###-#### Frame and Energy Pass.
BLD09-01112 BLD-Wall cover8/13/20098/14/20098/14/2009 10:54:21 AMAPASS
Scheduled by a contractor via Hello! on 8/13/2009 at 3:08:29 PM. Contact: ###-####.
Ext shear nailing OK
BLD09-00323 BLD-Other8/14/20098/14/20098/14/2009 12:00:00 AMAFAIL
On 8/4 and 8/11/2009 site visits were performed to review general framing provisions as required by 2006 IBC. CN's issued on observed deficiencies.