BLD09-00657
| BLD-Final | 8/14/2009 | 8/14/2009 | 8/14/2009 5:40:32 PM | P | NR |
|
|
Need Electr final.
|
BLD09-00969
| BLD-Footing | 8/14/2009 | 8/14/2009 | 8/14/2009 4:15:07 PM | P | PASS |
|
|
bruce - late afternoon please Phone #: ###-#### No special insp required. OK
|
ESC09-00360
| Site Preparation | 8/14/2009 | 8/14/2009 | 8/14/2009 4:14:25 PM | P | PASS |
|
|
Removed stockpile from driveway....swept hard surfaces. Allowed for Concr washout area with plastic liner.
|
ESC09-00423
| Site Preparation | 8/13/2009 | 8/14/2009 | 8/14/2009 3:35:38 PM | P | NR |
|
|
|
BLD09-01140
| BLD-Footing | 8/12/2009 | 8/14/2009 | 8/14/2009 3:35:13 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 8/12/2009 at 7:51:53 AM. Contact: ###-####.
|
BLD09-01197
| BLD-Footing | 8/14/2009 | 8/14/2009 | 8/14/2009 3:34:46 PM | P | PASS |
|
|
request late as possible pm//John Burton ###-#### Verified 20' rebar UFER ground....and 20' stranded copper wire prior to pour.
|
BLD09-00461
| BLD-Conference | 8/13/2009 | 8/14/2009 | 8/14/2009 12:42:54 PM | A | DONE |
|
|
brandon Phone #: ###-#### Inspection of straps at roof deck.....OK. OK to roof.
|
BLD08-01502
| BLD-Framing/Rough-in | 8/13/2009 | 8/14/2009 | 8/14/2009 12:41:14 PM | A | PASS |
|
|
Mitch Phone #: ###-#### Frame and Energy Pass.
|
BLD09-01112
| BLD-Wall cover | 8/13/2009 | 8/14/2009 | 8/14/2009 10:54:21 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/13/2009 at 3:08:29 PM. Contact: ###-####. Ext shear nailing OK
|
BLD09-00323
| BLD-Other | 8/14/2009 | 8/14/2009 | 8/14/2009 12:00:00 AM | A | FAIL |
|
|
On 8/4 and 8/11/2009 site visits were performed to review general framing provisions as required by 2006 IBC. CN's issued on observed deficiencies.
|