Inspections for the day of: Friday, August 14, 2009.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00499 Site Preparation8/14/20098/14/20098/14/2009 2:29:41 PM PASS
ESC09-00399 General Inspection8/10/20098/14/20098/14/2009 1:22:41 PMACANC
Duplicate
ESC09-00399 General Inspection8/10/20098/14/20098/14/2009 1:22:26 PMAPASS
ESC09-00360 Site Preparation8/14/20098/14/20098/14/2009 1:11:13 PM PART
Spoke with concrete company and they told me that washout will occur at batch plant and they will re-locate stockpile along the north end of drive way.
ESC09-00424 Random Inspection8/14/20098/14/20098/14/2009 11:51:55 AMPPASS
ESC09-00494 BMP Violation8/11/20098/14/20098/14/2009 10:23:16 AMAPASS
All issues corrected. Concrete washout will occur back into the the hopper of the pump truck and taken back to the batch plant.
ESC09-00495 Site Preparation8/14/20098/14/20098/14/2009 10:04:23 AM DONE
completed by 415
ESC09-00432 Site Preparation8/14/20098/14/20098/14/2009 9:22:55 AM PART
Verbal to RP:
provide a washout prior to the pour of any concrete.
ESC09-00233 Site Final5/14/20098/14/20098/13/2009 4:23:32 PMPCANC
Check for vegitation.