FIR13-00328
| INSP-Sprinkler Rough-in | 8/14/2013 | 8/14/2013 | 8/14/2013 4:05:08 PM | P | PASS |
|
|
sprinkler piping is ok to cover.
|
FIR13-00340
| INSP-Sprinkler Rough-in | 8/12/2013 | 8/14/2013 | 8/14/2013 3:42:56 PM | P | PASS |
|
|
Underground supply piping is ok to cover. Its 2" poly like all of the others.
|
FIR13-00037
| INSP-Final Inspection | 8/12/2013 | 8/14/2013 | 8/14/2013 3:05:40 PM | A | FAIL |
|
|
Permit will be able to final when the ceiling and pendant is installed in the electrical/mechanical room.
|
FIR12-00177
| INSP-Final Inspection | 8/13/2013 | 8/14/2013 | 8/14/2013 3:04:32 PM | A | FAIL |
|
|
Basement fire alarm is complete (smoke detector was relocated and pull station lowered for my return trip). First floor fire alrm is complete (except updated as-builts are needed showing one additional in-duct detector). Second floor fire alarm is almost complete (Need to test all duct detectors, add two a/v's as marked on the plans)
|
BLD13-01052
| FIRE-Final Inspection | 8/13/2013 | 8/14/2013 | 8/14/2013 12:09:29 PM | A | PART |
|
|
The PET/CT (break room/locker room) area life safety is passed.
|
BLD13-02076
| FIRE-Final Inspection | 8/12/2013 | 8/14/2013 | 8/14/2013 9:58:17 AM | A | PASS |
|
|
Life safety passed
|
BLD13-01260
| FIRE-Final Inspection | 8/13/2013 | 8/14/2013 | 8/14/2013 9:41:20 AM | A | PASS |
|
|
Life safety passed. Dead bolt to be removed prior to building inspection.
|
FIR13-00406
| INSP-Final Inspection | 8/13/2013 | 8/14/2013 | 8/14/2013 9:32:28 AM | A | PASS |
|
|
permit finaled
|
FIR13-00405
| INSP-Final Inspection | 8/13/2013 | 8/14/2013 | 8/14/2013 9:31:36 AM | A | PASS |
|
|
Permit finaled
|