ELE17-02602
| Final | 8/14/2017 | 8/14/2017 | 8/14/2017 3:53:59 PM | P | PASS |
|
|
Access to the mechanical room will come from Josh Wilson. Please call ###-#### 30 minutes prior to inspection to assure access. Phone #: ###-#### Inspection requested via web by Kelly Tarter Final for solar array install ok, no production of electricity being produced only pumps and a transformer was installed, solar panels only heat water only....
|
ELE17-02630
| Permanent Service | 8/13/2017 | 8/14/2017 | 8/14/2017 2:10:43 PM | P | PASS |
|
|
Mast was hit by tree. Idaho Power will disconnect power between 11:00 and 12:00 on 8-14-2017. Replacing weatherhead, mast, as well as wire to meter main. Family lives in residence. If there are any other issues inherent in the damage will fix and update as soon as possible. Phone #: ###-#### Inspection requested via web by Anastacio Fuentes p/s o/h rec ok
|
ELE17-01633
| Final | 8/14/2017 | 8/14/2017 | 8/14/2017 1:06:54 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Jason Wicks Cubicles checked out fine ok to occupy, breakroom still not finished will not allow public or workers in this area
|
ELE17-02049
| Electrical Rough-In | 8/14/2017 | 8/14/2017 | 8/14/2017 12:52:16 PM | P | PASS |
|
|
Ceiling inspection Phone #: ###-#### Inspection requested via web by steve sellers Suspended ceiling ok cover
|
ELE17-00287
| Final | 8/13/2017 | 8/14/2017 | 8/14/2017 11:47:34 AM | A | PART |
|
|
2ND floor rooms 230-241 3RD FLOOR 301-325 3RD floor rooms 330-341 Phone #: ###-#### Inspection requested via web by Hidajet Zahic Rooms 230-241 ok to occupy
|
ELE17-01633
| Final | 8/13/2017 | 8/14/2017 | 8/14/2017 9:42:34 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Jason Wicks Cubicles need to be 100% complete for final, Receptacles checked out fine all covers are not in place.....
|
ELE11-02621
| Final | 8/11/2017 | 8/14/2017 | 8/14/2017 9:24:08 AM | A | FAIL |
|
|
Open splices on exterior paddle fan and liquid tight conduit notrated for physical damage, Homeowner stated they will pull a seperate electrical permit so this permit can be closed out and re-issue building permit to resolve that issue. Very friendly to work with and will be calling the inspection in 14 days....
|
ELE16-01300
| Final | 8/10/2017 | 8/14/2017 | 8/14/2017 8:49:36 AM | A | PASS |
|
|
Kent Phone #: ###-#### Kitchen final ok Signed builing permit.....
|
ELE17-02041
| Permanent Service | 8/11/2017 | 8/14/2017 | 8/14/2017 8:29:29 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Available fault current calc will be posted proir to service being energized p/s u/g n ok
|