FIR18-00631
| INSP-Final Inspection | 8/13/2018 | 8/14/2018 | 8/14/2018 3:14:16 PM | A | PASS |
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Robert Gobler
|
FIR18-00130
| INSP-Sprinkler Rough-in | 8/13/2018 | 8/14/2018 | 8/14/2018 3:12:53 PM | P | FAIL |
|
|
Contractor was not done with the install and did not have approved plans or notes. No inspection performed.
Bryan Collins is the contact for this underground rough to cover inspection. He is hoping for an appointment around 2 Pm if that will work. We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD17-01025
| FIRE-Final Inspection | 8/13/2018 | 8/14/2018 | 8/14/2018 12:08:23 PM | A | CANC |
|
|
Life safety will be ok to pass when the project related fire alarm and fire sprinkler permits are finaled.
Tom Phone #: ###-####
|
FIR17-00694
| INSP-Final Inspection | 8/13/2018 | 8/14/2018 | 8/14/2018 12:07:38 PM | A | FAIL |
|
|
Could not test the interconnect with the fire alarm system. Forward flush passed.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00194
| INSP-Final Inspection | 8/13/2018 | 8/14/2018 | 8/14/2018 12:04:29 PM | A | FAIL |
|
|
City approved plans and data sheets were on site but no review comments. I noted alot of smoke detectors located too close to air grills, atleast on strobe is overspaced in the southwest corner of the second floor, the plans indicate two phone lines but one IP line has been installed instead. Plans need to be resubmitted showing the actual installation including battery backup, equipment used and wiring arrangements for the actual installation. No testing of devices have been performed due to the above issues.
Phone #: ###-#### Inspection requested via web by Gary Gambino
|
BLD18-02553
| FIRE-Final Inspection | 8/13/2018 | 8/14/2018 | 8/14/2018 9:56:19 AM | A | FAIL |
|
|
The scope of work and the plans indicate max storage height of 12'.The racks on the south side of the warehouse have a top shelf installed at 12' so the potential for storage exceeding 12' is provided. The racks on the north side of the warehouse are closer to 20' in height. Plans need to be resubmitted for high piled storage. Also the racks at the south wall have been reduced in lenght.
Jeff Phone #: ###-####
|
FIR18-00454
| INSP-Sprinkler Rough-in | 8/13/2018 | 8/14/2018 | 8/14/2018 9:32:46 AM | A | FAIL |
|
|
The pendant heads are overspaced along the north office wall.
|
FIR18-00239
| INSP-Sprinkler Rough-in/Hydro | 8/14/2018 | 8/14/2018 | 8/14/2018 9:32:04 AM | P | PASS |
|
|
overhead hydro for both wet systems witnessed with no visible loss at guage.
|