ELE17-02875
| ELE-Aging Inspection | 8/14/2019 | 8/14/2019 | 8/15/2019 5:37:59 AM | | DONE |
|
|
Please coordinate an electrical inspection
|
ELE18-01606
| Final | 8/14/2019 | 8/14/2019 | 8/14/2019 2:40:51 PM | P | PART |
|
|
B Building First floor D units trim inspection Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial for 1st floor Bldg D. In 1 bed units there 2 recepts that need replaced with GFI's, 6' from kitch sink. 2 bed units is 1 GFI needing installed, spark rings also. NO move in of furniture or other equiptment. I will need full access to all walls in all units. Will check these units for GFI's on next inspection.
|
ELE19-01465
| Electrical Rough-In | 8/13/2019 | 8/14/2019 | 8/14/2019 2:14:09 PM | P | NH |
|
|
Dave Phone #: ###-#### Left message with contact at 11am. No return call. I am no longer in area.
|
ELE19-02915
| Final | 8/14/2019 | 8/14/2019 | 8/14/2019 2:13:30 PM | P | PASS |
|
|
Micha Phone #: ###-#### Ok final. 400a, 2-2 pole 200a brkrs feeding 2 subpanels. A new 200a disc was installed outside for panel B. Panel B's brkr feeds disc off load side. This was the only way to do a line side connection as connections would have been inside meter base and not accessible. All labeling and fittings installed.
|
ELE19-02972
| Electrical Rough-In | 8/14/2019 | 8/14/2019 | 8/14/2019 1:37:35 PM | P | PASS |
|
|
Micha Phone #: ###-#### Ok cover. All items UL listed
|
ELE19-00569
| Final | 8/14/2019 | 8/14/2019 | 8/14/2019 12:50:18 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Clinton Warren Ok final. All recepts TR, and floor heat GFI functions properly
|
ELE19-02363
| Electrical Rough-In | 8/14/2019 | 8/14/2019 | 8/14/2019 11:44:16 AM | P | PASS |
|
|
Soffit cover only for three remaining units. 102, 103, 105. This will be ready by 10:00 AM Phone #: ###-#### Inspection requested via web by Cevyn Recla Ok cover soffitts for units listed.
|
ELE19-02907
| Permanent Service | 8/14/2019 | 8/14/2019 | 8/14/2019 11:43:04 AM | P | PASS |
|
|
Mitch Phone #: ###-#### p/s o/h rec ok
|
ELE19-02483
| Electrical Rough-In | 8/13/2019 | 8/14/2019 | 8/14/2019 11:23:53 AM | P | PASS |
|
|
Jason is contact onsite. Ceiling rough-in Phone #: ###-#### Inspection requested via web by Deb Ipsen Ok cover timeout rm, and bath.
|
ELE19-02685
| Final | 8/14/2019 | 8/14/2019 | 8/14/2019 11:01:22 AM | P | PASS |
|
|
final inspection Phone #: ###-#### Inspection requested via web by Dale Johnson Ok final.
|
ELE19-03023
| Electrical Rough-In | 8/13/2019 | 8/14/2019 | 8/14/2019 10:45:40 AM | A | PASS |
|
|
Pool bonding Phone #: ###-#### Inspection requested via web by Angela Stears Ok cover. 5 corners bonded with DB acorns. Hottub is incorporated in pool. 2 LV lights. 1 pool, and 1 hottub.
|
ELE19-02043
| Final | 8/13/2019 | 8/14/2019 | 8/14/2019 10:21:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson Ok final.
|
ELE19-02711
| Electrical Rough-In | 8/14/2019 | 8/14/2019 | 8/14/2019 10:21:11 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams Ok cover kitchen. NE corner is a china hutch. There will need to be another outlet or plug strip by final.
|
ELE19-02593
| Final | 8/13/2019 | 8/14/2019 | 8/14/2019 9:43:00 AM | A | PASS |
|
|
Matt Bryan, customer Phone #: ###-#### Inspection requested via web by BRS Permitting There were no violations. Ok final. Electrician/Installers number again was not available. Employee contacted me that morning asking to meet onsite for inspection. During inspection he told me that he was not a licensed individual. He was the person that took care of permits for the area (Jeff). From here on out, if a non-licensed individual is sent out for the inspection, it will be a double fee and a fail. The same goes for proper contact info of person or persons that did the work.
|
ELE19-03022
| Temporary Service | 8/13/2019 | 8/14/2019 | 8/14/2019 8:54:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by danny perrine t/s u/g n ok
|