FIR00-00473
| INSP-Sprinkler Rough-in | 8/14/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | A | FAIL |
|
|
R/I- ###-#### JEFF FIRE plans not approved; thrust block needed 8/15/2000 11:16:09 AM
|
BLD00-01087
| FIRE-Final Inspection | 8/14/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 13:35:44. Contact: ###-####. need NAC wired; test damper operation; sprinkler issues 8/15/2000 11:16:49 AM
|
BLD00-01893
| FIRE-Final Inspection | 8/14/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | FAIL |
|
|
GREGG-- ###-#### FIRE FN alarms not complete; door to corridor 8/15/2000 4:49:37 PM
|
BLD00-01948
| FIRE-Final Inspection | 8/14/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | PASS |
|
|
GREGG ###-#### FN FIRE
|
BLD99-02158
| FIRE-Conference | 8/14/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 09:46:22. Contact: ###-####. alarms not ready 8/15/2000 4:49:59 PM
|
BLD00-01523
| FIRE-Final Inspection | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | PASS |
|
|
steve-- pager # ###-#### fire fn
|
BLD99-01720
| FIRE-Final Inspection | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | NR |
|
|
###-####--FRANK ----FIRE FN called and said they will reschedule 8/16/2000 12:42:11 PM
|
BLD00-02078
| FIRE-Final Inspection | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 09:36:08. Contact: ###-####. fire inspection not required 8/15/2000 4:50:26 PM
|