MEC00-02386
| Pressure Test | 8/14/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 13:44:26. Contact: ###-####. added dryer/range 8/15/2000 10:17:02 AM
|
MEC00-02735
| Rough-in | 8/14/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 13:44:53. Contact: ###-####.
|
MEC00-02735
| Pressure Test | 8/14/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 13:45:06. Contact: ###-####.
|
MEC00-02490
| Rough-in | 8/14/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | A | FAIL |
|
|
meagon ###-#### 2 f/p finish framing back of f/p 8/15/2000 9:17:07 AM
|
MEC00-02717
| Rough-in | 8/14/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 15:15:27. Contact: ###-####.
|
MEC00-02740
| Final | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | PASS |
|
|
STEVE OR KELLY ###-#### FN...GAS LINE TO F/P AND RANGE OK...WILL NEED TO BRING 1" DOWN TO FURN IN ORDER TO USE THE RANGE...3/4" TO SMALL FOR ALL APPLIANCES..THEY NEEDED TO COVER THE BASEMENT CEILING...DIXIE 8/15/2000 4:22:30 PM
|
MEC00-02733
| Rough-in | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 07:51:46. Contact: ###-####.
|
MEC00-02751
| Rough-in | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | FAIL |
|
|
###-####
|
MEC00-02751
| Pressure Test | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | FAIL |
|
|
PIPE UNDERSIZED TO EQ 8/15/2000 1:48:05 PM
|
MEC00-02752
| Rough-in | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | FAIL |
|
|
JOE-- ###-#### R/I..NEED 60 LB TEST..NEED PROT PLATES 8/15/2000 2:46:33 PM
|
MEC00-02755
| Final | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | PASS |
|
|
MARTY ###-#### CELL FN
|
MEC00-02678
| Rough-in | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | PASS |
|
|
R/I & PRES TEST JERRY ###-####
|
MEC00-02678
| Pressure Test | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | PASS |
|
|
JERRY ###-#### PRES TEST
|
MEC00-01503
| Final | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 09:41:14. Contact: ###-####. GAS 8/15/2000 3:00:06 PM G 8/15/2000 3:00:29 PM GU 8/15/2000 3:01:44 PM GUAGE PEGGED 8/15/2000 3:02:11 PM
|
MEC00-02648
| Rough-in | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 10:20:17. Contact: ###-####.
|
MEC00-02648
| Pressure Test | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 10:20:46. Contact: ###-####.
|
MEC00-02656
| Rough-in | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 411 On 8/15/2000
|
MEC00-02156
| Rough-in | 8/15/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 411 On 8/15/2000 NOT READY...DUCTING AND GAS PIPING NOT DONE
|
MEC00-01114
| Rough-in | 8/14/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 09:14:08. Contact: ###-####. NOBODY HOME 8/15/2000 2:51:22 PM
|
MEC00-01114
| Pressure Test | 8/14/2000 | 8/15/2000 | 8/15/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 09:14:23. Contact: ###-####. NOBODY HOME 8/15/2000 2:51:14 PM
|