BLD00-01774
| BLD-Final | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | FAIL |
|
|
###-#### handrail not complet. 8/15/2001 5:23:59 PM
|
BLD00-02920
| BLD-Wall cover | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/15/2001 at 06:21:34. Contact: ###-####. 2 hr wall at 36 cafateria to fab tube steel incapsulated c/n this idem ok/ basement fire collors at chem room 2-2'' emt instalation ok c/n idem ok. 8/15/2001 11:45:32 AM
|
BLD01-01893
| BLD-Footing | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 08/15/2001 at 07:01:18. Contact: ###-####.
|
BLD01-01893
| BLD-Footing | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 08/15/2001 at 07:01:18. Contact: ###-####.
|
BLD01-00654
| BLD-Concrete | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 12:40:56. Contact: ###-####. placed w/special insp. 8/15/2001 11:58:14 AM
|
BLD01-00653
| BLD-Concrete | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 12:41:59. Contact: ###-####. placed w/special insp. 8/15/2001 11:58:30 AM
|
BLD00-03338
| BLD-Final | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PASS |
|
|
###-#### scott final ok 8/15/2001 3:59:39 PM
|
MIS01-00163
| BLD-Conference | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | DONE |
|
|
Rehab request for housing code. Contact Elmer @ ###-#### for access. This is a two unit dwelling, look at both. Last time I was here this property was abandoned,325. Rescheduled to 8/16 by 325.
|
BLD01-01850
| BLD-Footing | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
jed- ###-####
|
BLD01-01723
| BLD-Framing/Rough-in | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PART |
|
|
###-#### no thermal break in garage slab.ok to insulate. 8/15/2001 4:53:33 PM
|
BLD01-01725
| BLD-Framing/Rough-in | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD01-01061
| BLD-Final | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
###-#### cell mike final ok 8/15/2001 3:31:06 PM
|
BLD01-01592
| BLD-Conference | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/15/2001 at 11:05:54. Contact: ###-####. fire dept. mandated that draft curtins be removed. approved plan are specific to location of draft curtins architect to resolve isue with plan reviewers no occupance until resolved/ no storage on racking allowed until approval from bld. dept. 8/17/2001 9:58:21 AM
|
BLD97-01911
| BLD-Final | 8/13/2001 | 8/15/2001 | 8/14/2001 12:00:00 AM | A | DONE |
|
|
###-#### dennis canc this day //dld
|