Inspections for the day of: Wednesday, August 15, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-02757 Plumbing Rough-in8/14/20018/15/20018/15/2001 12:00:00 AMAFAIL
###-#### upc 905.3 need to be 6-inches above flood level rim before offsetting horizontally 8/15/2001 11:42:27 AM
PLM01-01725 Final8/14/20018/15/20018/15/2001 12:00:00 AMAPASS
###-#### garage code 4444
PLM01-02759 Sprinkler (Final)8/14/20018/15/20018/15/2001 12:00:00 AMAPASS
RYAN ###-#### BACKFLOW
PLM01-00353 Final8/14/20018/15/20018/15/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/14/2001 at 16:15:49. Contact: ###-####.
PLM01-01524 Final8/14/20018/15/20018/15/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/14/2001 at 16:45:45. Contact: ###-####.
PLM01-02733 Water and/or Sewer8/15/20018/15/20018/15/2001 12:00:00 AMPPASS
###-####
PLM00-04316 Final8/15/20018/15/20018/15/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/15/2001 at 08:55:41. Contact: ###-####.
PLM01-02762 Groundwork8/15/20018/15/20018/15/2001 12:00:00 AMPPASS
early pm ###-#### ground work for in side building only ok 8/15/2001 4:38:44 PM
PLM01-02757 Plumbing Rough-in8/15/20018/15/20018/15/2001 12:00:00 AMPPASS
Scheduled by Inspector: 360 On 8/15/2001 11:36:37 AM ###-#### 8/15/2001 11:45:18 AM