PLM01-02757
| Plumbing Rough-in | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | FAIL |
|
|
###-#### upc 905.3 need to be 6-inches above flood level rim before offsetting horizontally 8/15/2001 11:42:27 AM
|
PLM01-01725
| Final | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PASS |
|
|
###-#### garage code 4444
|
PLM01-02759
| Sprinkler (Final) | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PASS |
|
|
RYAN ###-#### BACKFLOW
|
PLM01-00353
| Final | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 16:15:49. Contact: ###-####.
|
PLM01-01524
| Final | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 16:45:45. Contact: ###-####.
|
PLM01-02733
| Water and/or Sewer | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM00-04316
| Final | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/15/2001 at 08:55:41. Contact: ###-####.
|
PLM01-02762
| Groundwork | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
early pm ###-#### ground work for in side building only ok 8/15/2001 4:38:44 PM
|
PLM01-02757
| Plumbing Rough-in | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 8/15/2001 11:36:37 AM ###-#### 8/15/2001 11:45:18 AM
|