BLD01-01704
| BLD-Framing/Rough-in | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PART |
|
|
###-####
framing c/n made ok, new c/n on proper energy compliance report to verify at final, energy package in and ok, may have to insulate floor 8/15/2001 12:11:14 PM
|
BLD00-02940
| BLD-Framing/Rough-in | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 12:05:34. Contact: ###-####.
c/n posted, no formal inspection made, note: no ftg or foundation inspection shows up in history 8/15/2001 12:33:05 PM
|
BLD01-02027
| BLD-Footing | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PART |
|
|
###-####
|
BLD01-01215
| BLD-Framing/Rough-in | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | NR |
|
|
###-#### bob
not nailed off yet 8/15/2001 10:21:03 AM
|
BLD01-01167
| BLD-Conference | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PART |
|
|
###-#### rich please call before
winder stair issues,. will go back w/ handout 8/15/2001 10:20:29 AM
|
BLD01-01876
| BLD-Energy code compliance | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 18:26:25. Contact: ###-####.
|
BLD01-01834
| BLD-Footing | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PART |
|
|
###-#### randy
house ftgs ok 8/15/2001 4:11:11 PM
|
BLD01-01167
| BLD-Conference | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
stair issues 8/15/2001 10:23:24 AM
gave papers on stairs, also talked about blocking trusses per architect, ok to change detail w/ arch. approval 8/15/2001 4:06:41 PM
|
BLD01-01215
| BLD-Framing/Rough-in | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PART |
|
|
shear/ hold downs 8/15/2001 10:22:32 AM
most ok, need to block per plans, ok to side unaffected areas 8/15/2001 4:17:35 PM
|
BLD01-02162
| BLD-Footing | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PART |
|
|
ok w/ verbal corrections 8/15/2001 4:10:43 PM
|
BLD01-00534
| BLD-Framing/Rough-in | 8/10/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/10/2001 at 19:43:07. Contact: ###-####.
prior c/n still governs 8/15/2001 2:17:40 PM
|