BLD01-00615
| BLD-Footing | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 425 On 8/15/2001 11:51:29 AM
|
BLD01-01922
| BLD-Framing/Rough-in | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 425 On 8/15/2001 11:52:28 AM nw sw and se roof framing on corners
|
BLD01-00736
| BLD-Concrete | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PART |
|
|
###-#### clay ..... russ owen requested that david hannah look at this talked with mason and spec insp about high left grouting 8/15/2001 1:06:00 PM
|
BLD00-03712
| BLD-Final | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | FAIL |
|
|
###-#### sheila needs fire door into garage and hinges and landing out back door 8/15/2001 10:52:15 AM
|
BLD01-01922
| BLD-Footing | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-00615
| BLD-Framing/Rough-in | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PASS |
|
|
###-#### 8/15/2001 11:48:48 AM canapy over drive through 8/15/2001 11:51:07 AM
|
BLD01-02203
| BLD-Energy code compliance | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | A | PASS |
|
|
###-#### michel
|
BLD01-02019
| BLD-Foundation | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PART |
|
|
###-#### 8/15/2001 1:48:51 PM
|
BLD01-02148
| BLD-Footing | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PART |
|
|
###-#### work in progress 8/15/2001 2:47:21 PM
|
BLD01-00633
| BLD-Final | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD01-01140
| BLD-Framing/Rough-in | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD01-01141
| BLD-Framing/Rough-in | 8/14/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | FAIL |
|
|
nail north side of 3 ply truss 8/15/2001 2:20:54 PM
|
BLD01-01186
| BLD-Framing/Rough-in | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
###-#### steve frist floor fire wall 8/15/2001 4:15:33 PM
|
BLD01-01187
| BLD-Framing/Rough-in | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
###-#### steve first floor fire wall 8/15/2001 4:16:46 PM
|
BLD01-01188
| BLD-Framing/Rough-in | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
###-#### steve frist floor fire wall 8/15/2001 4:15:50 PM
|
BLD01-01189
| BLD-Framing/Rough-in | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
###-#### steve frist floor fire wall 8/15/2001 4:15:18 PM
|
BLD01-01140
| BLD-Energy code compliance | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 425 On 8/15/2001 2:20:04 PM
|
BLD01-01141
| BLD-Energy code compliance | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 425 On 8/15/2001 2:21:10 PM
|
BLD01-01490
| BLD-Framing/Rough-in | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | NR |
|
|
woody -###-#### cell fr home ###-#### 8/15/2001 3:42:42 PM needs to do elec and block shear panels 8/15/2001 4:14:04 PM
|
BLD01-00633
| BLD-Framing/Rough-in | 8/15/2001 | 8/15/2001 | 8/15/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 425 On 8/15/2001 2:58:42 PM
|