PLM02-02527
| Sprinkler (Final) | 8/14/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-02528
| Sprinkler (Final) | 8/14/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-00129
| Final | 8/14/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 08/14/2002 at 16:08:03. Contact: ###-####. doors are locked 8/15/2002 9:58:51 AM
|
PLM02-02005
| Other | 8/14/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/14/2002 at 19:13:56. Contact: ###-####. ri conference, sems to know what to do for the 1st floor restroom, will call for conference on the new 2nd floor restroom when its framed up, talked to him about adding a recirc to the existing pb water system and sugested replacing with pex. may just rough in recirc at this time. 8/15/2002 9:37:13 AM 8/15/2002 9:37:43 AM
|
PLM02-02532
| Plumbing Rough-in | 8/15/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | P | DONE |
|
|
greg ###-####
|
PLM02-02533
| Water and/or Sewer | 8/15/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | P | PASS |
|
|
###-#### ken final ok with vb on bury hydrant 8/15/2002 2:47:57 PM
|
PLM02-01685
| Final | 8/15/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | P | PART |
|
|
CHARLIE ###-#### I dont care if they move in to their new bedroom before they get their tub complete 8/15/2002 4:39:40 PM
|
PLM02-01417
| Final | 8/15/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/15/2002 at 09:40:24. Contact: ###-####. calk janitor sink, complete drain, soap dispensors , adjust building drain c.o. temp occ ok 8/15/2002 4:21:48 PM
|
PLM02-00129
| Final | 8/15/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | P | PART |
|
|
secure dcva, expose c.o., lav leak 105,102,202,302,305, adjust wc flapper 304, water heater valve leak205, temp occ ok 8/15/2002 3:53:45 PM
|
PLM02-02460
| Sprinkler (Final) | 8/15/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-01716
| Final | 8/15/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/15/2002 at 10:40:11. Contact: ###-####. ACCESS OPEN IF NOT PLEASE CALL
|
PLM02-02539
| Plumbing Rough-in | 8/15/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | P | PART |
|
|
CONFERENCE JAY ###-#### every thing looks ok except the tubvalve has an inlet below the clawfoot tub rim 8/15/2002 2:08:30 PM
|
PLM02-02399
| Sprinkler (Final) | 8/15/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | P | PASS |
|
|
JOEY ###-####
|