MEC02-02234
| Rough-in | 8/12/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-02234
| Pressure Test | 8/12/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | A | PASS |
|
|
|
BLD02-00185
| BLD-Final | 8/14/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | A | PASS |
|
|
###-####c.c # 17622 issued 8/15/2002 11:26:26 AM
|
BLD02-01237
| BLD-Footing | 8/14/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | A | NR |
|
|
MIKE; Phone #: ###-####
|
BLD02-00453
| BLD-Other | 8/15/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/15/2002 at 07:44:56. Contact: ###-####.need engineer on site to inspect and evaluate hold downs problems will need their retro design fix shear will need tobe completly reinspected 8/15/2002 1:58:32 PM
|
BLD02-00558
| BLD-Framing/Rough-in | 8/15/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | P | FAIL |
|
|
###-#### need engineer to evaluate shear panels on back wall restaple areas on panels 8/15/2002 5:20:24 PM
|
BLD02-00556
| BLD-Framing/Rough-in | 8/15/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | P | FAIL |
|
|
###-#### need eng to evaluate shear panels and staple per plan c/n on site same as 3221 and 3261 8/15/2002 5:17:56 PM
|
BLD02-00554
| BLD-Framing/Rough-in | 8/15/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | P | FAIL |
|
|
867-*0707 c/n on site needs engineer to evaluate shear panels back wall restaple ares on panels 8/15/2002 5:19:03 PM
|
BLD02-01382
| BLD-Energy code compliance | 8/15/2002 | 8/15/2002 | 8/15/2002 12:00:00 AM | P | PASS |
|
|
###-#### RYAN ok to cover 8/15/2002 5:15:08 PM
|