PLM03-01944
| Final | 8/14/2003 | 8/15/2003 | 8/15/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/14/2003 at 5:48:44 PM. Contact: ###-####. need to provide a double check for proofer and expose all of floor sink and provide a chase from cabnit base to floor and sealed to make water tight for floor sink under soda tower cabnit called plumbing contractor will recall when ready 8/15/2003 12:07:14 PM
|
PLM03-02526
| Plumbing Rough-in | 8/15/2003 | 8/15/2003 | 8/15/2003 12:00:00 AM | P | PASS |
|
|
kevin ###-####
|
PLM03-02530
| Sprinkler (Final) | 8/15/2003 | 8/15/2003 | 8/15/2003 12:00:00 AM | P | PASS |
|
|
danny ###-####
|
PLM03-00088
| Final | 8/14/2003 | 8/15/2003 | 8/15/2003 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Liz Sasser oked temp. Debest plumbing to fax copy of med gas veification and final testing report along with a approved letter from Qunatum eng. verifying deveation on med gas plan,s monday 8/18/ 2003 8/15/2003 5:21:33 PM
|