Inspections for the day of: Monday, August 15, 2005.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE05-02920 Electrical Rough-In8/15/20058/15/20058/15/2005 4:25:04 PMPPASS
Trench inspection for (6) parking lot lights.; Phone #: ###-#### Internet Inspection Request from: Dana Moyer ok to cover u/g for parking lot lites
ELE05-02448 Electrical Rough-In8/15/20058/15/20058/15/2005 4:24:17 PMPPASS
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa called contr to put in gec access plate, ric ok
ELE05-02325 Permanent Service8/15/20058/15/20058/15/2005 2:59:32 PMPCANC
###-#### tom see final
ELE05-01536 Final8/15/20058/15/20058/15/2005 2:29:48 PMPPASS
tim-- re-insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie corrections made, ok to final
ELE05-02923 Electrical Rough-In8/15/20058/15/20058/15/2005 1:29:35 PMPPASS
underground -shawn; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie corr made, u/g ok to cover from house to shop
ELE05-01840 Final8/15/20058/15/20058/15/2005 12:57:06 PMPPASS
###-#### tom ok to final
ELE05-02891 Permanent Service8/15/20058/15/20058/15/2005 12:18:32 PMPPASS
lala; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa p/s o/h n ok
ELE05-02765 Permanent Service8/12/20058/15/20058/15/2005 10:11:44 AMAPART
calvin ###-####--re-insp p/s o/h n ok, need to fill dirt around foundation for meter height.
ELE05-02966 Electrical Rough-In8/12/20058/15/20058/15/2005 9:50:15 AMAFAIL
Scheduled by a contractor via Hello! on 8/12/2005 at 2:03:49 PM. Contact: ###-####. told owner needed 2nd gnd rod, color phase wires, bush se conductors, panel schedule
ELE05-02847 Electrical Rough-In8/12/20058/15/20058/15/2005 9:19:38 AMAPASS
ufer ground inspection///butch; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa gec ok to pour
ELE05-02914 Permanent Service8/15/20058/15/20058/15/2005 8:57:12 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Dana Moyer ric ok, walls, clg
ELE04-04122 Electrical Rough-In8/12/20058/15/20058/15/2005 8:19:15 AMANR
This inspection is for 5 lightpole vases contact is steve Sellers ; Phone #: ###-#### Internet Inspection Request from: Samantha Patterson only gnd to cages installed. still putting in cnd. told contr to call in for early pm
ELE05-01706 Final8/12/20058/15/20058/15/2005 8:14:38 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Lee VanSchoiack corr made, ok to final
ELE05-02913 Temporary Service8/12/20058/15/20058/15/2005 8:13:44 AMAPASS
dan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie called contr about abrasion prot for gnd elec cond, and label panel. t/s o/h n ok
ELE05-02325 Final8/15/20058/15/20058/15/2005 12:00:00 AMPPASS
###-#### tom ok to final