BLD07-01341
| FIRE-Final Inspection | 8/14/2007 | 8/15/2007 | 8/23/2007 1:57:36 PM | A | FAIL |
|
|
Need to provide approved hardware at the doors to the mens and womens restrooms.
|
BLD07-01349
| FIRE-Final Inspection | 8/14/2007 | 8/15/2007 | 8/17/2007 2:08:55 PM | A | FAIL |
|
|
Hardware is not approved at the restroom doors.
|
FIR07-00474
| INSP-Final Inspection | 8/14/2007 | 8/15/2007 | 8/15/2007 4:36:06 PM | A | NR |
|
|
Project is not ready for final inspection at this time.
|
FIR07-00462
| INSP-Final Inspection | 8/15/2007 | 8/15/2007 | 8/15/2007 4:31:20 PM | P | NR |
|
|
Pending project related fire sprinkler work completion.
|
BLD07-00352
| FIRE-Final Inspection | 8/15/2007 | 8/15/2007 | 8/15/2007 4:29:38 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR07-00656
| INSP-Final Inspection | 8/15/2007 | 8/15/2007 | 8/15/2007 4:28:53 PM | P | PASS |
|
|
Final fire sprinkler inspection passed, permit finaled.
|
FIR07-00593
| INSP-Sprinkler Rough-in/Hydro | 8/15/2007 | 8/15/2007 | 8/15/2007 3:23:55 PM | P | FAIL |
|
|
Two heads on the second floor are obstructed by ceilng mounted beams, noted three areas lacking sufficient cold cavity protection, one SW head adjusted while on site.
|
BLD07-00919
| FIRE-Final Inspection | 8/15/2007 | 8/15/2007 | 8/15/2007 3:21:46 PM | P | FAIL |
|
|
Noted modifications to the existing fire alarm system have been made per site visit and as indicated on approved plans sheet E2.1. Any alteration, extension or modification to an existing FA system requires a fire alarm permit and field inspection for code compliance. This will need to be completed prior to a BLD life safety final.
|
FIR07-00316
| INSP-Supply line flush | 8/15/2007 | 8/15/2007 | 8/15/2007 1:39:49 PM | P | PART |
|
|
UG fire supply line flush completed satisfactory.
|
FIR07-00568
| INSP-Supply line flush | 8/14/2007 | 8/15/2007 | 8/15/2007 11:16:44 AM | A | CANC |
|
|
Wrong permit number called in for inspection.
|
FIR07-00624
| INSP-Final Inspection | 8/14/2007 | 8/15/2007 | 8/15/2007 10:40:59 AM | A | FAIL |
|
|
Two heads at the waiting area exceed min. spacing allowed, need to provide verification that the existing system design will support more than one head piped off a single 1" outlet (noted 4 heads are supplied off one 1" outlet at the lobby) or install heads as shown on approved plan.
|