BLD06-00213
| FIRE-Final Inspection | 8/14/2008 | 8/15/2008 | 8/18/2008 5:09:26 PM | A | PASS |
|
|
Okay for life safety final.
|
BLD04-01836
| FIRE-Final Inspection | 8/15/2008 | 8/15/2008 | 8/18/2008 10:44:32 AM | P | PASS |
|
|
Fire life safety finaled.
|
FIR08-00130
| INSP-Final Inspection | 8/15/2008 | 8/15/2008 | 8/15/2008 4:38:05 PM | P | PASS |
|
|
Field verified noted correction items, fire sprinkler permit finaled.
|
BLD07-00007
| FIRE-Final Inspection | 8/15/2008 | 8/15/2008 | 8/15/2008 4:37:54 PM | P | PART |
|
|
See notice of violation for corrections made. KR
|
FIR08-00452
| INSP-Final Inspection | 8/14/2008 | 8/15/2008 | 8/15/2008 4:36:30 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR08-00255
| INSP-Final Inspection | 8/11/2008 | 8/15/2008 | 8/15/2008 3:49:20 PM | A | PART |
|
|
See notice of violation paper work for corrections completed.KR
|
FIR08-00483
| INSP-Final Inspection | 8/14/2008 | 8/15/2008 | 8/15/2008 3:47:42 PM | A | FAIL |
|
|
Could not do a complete test. Make up air not functioning.KR
|
FIR07-00606
| INSP-Sprinkler Rough-in | 8/14/2008 | 8/15/2008 | 8/15/2008 2:59:08 PM | A | PART |
|
|
Heads at the drop ceiling classroom A106 are good for cover, recieved as-built plans for documentation of field changes.
|
FIR08-00417
| INSP-Final Inspection | 8/14/2008 | 8/15/2008 | 8/15/2008 2:57:10 PM | P | PART |
|
|
Permit final pending completion of work at the basement level new fabrication room as red-lined on plans.
|
BLD08-00956
| FIRE-Final Inspection | 8/13/2008 | 8/15/2008 | 8/15/2008 2:55:44 PM | P | PART |
|
|
Final pending ceiling work at the basement level computer lab and ceiling/fire sprinkler work at the new fabrication room. EM lights and exit signs tested okay, project related FA is finished, remiander of life safety per the scope of work is acceptable.
|
FIR08-00416
| INSP-Final Inspection | 8/14/2008 | 8/15/2008 | 8/15/2008 2:50:43 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR08-00503
| INSP-Final Inspection | 8/15/2008 | 8/15/2008 | 8/15/2008 12:22:11 PM | A | PART |
|
|
Final pending ceiling tile and escutcheons.
|
FIR08-00545
| INSP-Sprinkler Rough-in/Hydro | 8/15/2008 | 8/15/2008 | 8/15/2008 10:42:38 AM | A | FAIL |
|
|
Provide plans reflecting the installation of upright protection above the ceilings at the east side.
|
FIR08-00517
| INSP-Sprinkler Rough-in/Hydro | 8/15/2008 | 8/15/2008 | 8/15/2008 10:40:17 AM | A | PART |
|
|
See plans for areas okayed to cover at the 4th floor.
|