FIR11-00324
| INSP-Alarm Testing | 8/15/2011 | 8/15/2011 | 8/16/2011 3:29:16 PM | P | NR |
|
|
|
FIR11-00194
| INSP-Sprinkler Rough-in/Hydro | 8/15/2011 | 8/15/2011 | 8/15/2011 4:33:53 PM | P | PART |
|
|
|
BLD10-02862
| FIRE-Final Inspection | 8/15/2011 | 8/15/2011 | 8/15/2011 4:33:37 PM | P | NR |
|
|
Work in progress
|
FIR11-00390
| INSP-Sprinkler Rough-in | 8/15/2011 | 8/15/2011 | 8/15/2011 3:41:31 PM | P | PART |
|
|
OH rough-in passed.
|
FIR10-00473
| INSP-Final Inspection | 8/15/2011 | 8/15/2011 | 8/15/2011 3:29:17 PM | P | PART |
|
|
UG permit okay for final when overhead is finaled.
|
BLD11-00483
| FIRE-Final Inspection | 8/15/2011 | 8/15/2011 | 8/15/2011 3:28:20 PM | P | PASS |
|
|
Items on correction notice verified for completion. One additional PFE installed while on site. Life safety passed.
|
BLD11-01902
| FIRE-Final Inspection | 8/15/2011 | 8/15/2011 | 8/15/2011 3:25:50 PM | P | PASS |
|
|
Life safety inspection passed. Signature card not available on site.
|
BLD11-01862
| FIRE-Final Inspection | 8/12/2011 | 8/15/2011 | 8/15/2011 3:24:07 PM | A | FAIL |
|
|
C/N items include removal of the curtain obstructing the egress path to the second exit, remove storage at the exit corridor, provide cover and approved terminals at the exposed eletrical wiring on the mezzanine level, remove padlock at the cooler door. See items #3 and 6 on the permit documents.
|
FIR11-00301
| INSP-Conference | 8/12/2011 | 8/15/2011 | 8/15/2011 3:18:13 PM | A | DONE |
|
|
On site conference with contractor regarding project design, installation, schedule, etc.
|