Inspections for the day of: Monday, August 15, 2011.
Number of inspections: 11
Percentage of inspections complete: 82 %
Percentage of inspections not complete: 18 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00186 Aging Inspection8/8/20118/8/2011   
ESC11-00039 General Inspection8/12/20118/12/2011   
MIS11-00104 MIS-Aging Inspection8/15/20118/15/20118/15/2011 2:40:15 PM PASS
BLD10-02069 BLD-Footing8/12/20118/15/20118/15/2011 2:39:00 PMPPART
Rebar & epoxy by special inspector at 9:00 AM
Rebar and footing inspection needed at 1:00 if possible
Concrete scheduled at 2:00 PM Phone #: ###-#### >> Inspection requested via web by Ricardo Donosso. Grade beam footings on grid line 23, North portion of building (ordinance room). Noted that their has been a structural change to footings from city set of approved plans, a plan mod needs to be sumbitted to cty for approval.
BLD10-01628 BLD-Final8/12/20118/15/20118/15/2011 11:36:22 AMAPART
Please call when you are heading towards project. Phone #: ###-#### >> Inspection requested via web by Paul Saucerman. Needs special inspection final letter. Evedrthing else ok.
ESC10-00547 Site Final8/15/20118/15/20118/15/2011 11:35:48 AMADONE
ESC10-00547 DOC - Permit Finaled8/15/20118/15/20118/15/2011 11:35:41 AMPPASS
BLD11-01503 BLD-Footing8/12/20118/15/20118/15/2011 11:35:23 AMACANC
Hollis Phone #: ###-####. Inspection performed last friday.
ESC11-00352 General Inspection8/15/20118/15/20118/15/2011 11:34:58 AMAPASS
BLD11-01260 BLD-Framing/Rough-in8/14/20118/15/20118/15/2011 11:34:31 AMAFAIL
Approved set of plans should be onsite. They might be in the tube out front. Phone #: ###-#### >> Inspection requested via web by Rustin Ray. Fireblock area at concelled space at tub/shower at ceiling, SeaL AROUND GAS PIPE PENETRATION THROUGH WALL AND BOTTOM PLATE (south wall), Connect bottom chord on C3 truss as per truss engineering. Provide code compliant steps from garage. Justify bearing point change on A3 and A4 truss, provide engineered fix from BMC. Fireblock at plumbing penetration by stairs. Bonus room knee wall trusses need to be furred out to accept R21 insulation and encapsulated. All other vaulted areas need to be encapsulated as well. Provide correct portal frame framing as shown on sheet 1 and 3 on approved plans. Correction notice posted, not ok to insulate.
BLD08-00986 BLD-Other8/15/20118/15/20118/15/2011 12:00:00 AMADONE
Ok to reactivate permit upon receipt of 2 hour admin fee.. Bob A.