ESC13-00448
| General Inspection | 8/15/2013 | 8/15/2013 | 8/19/2013 4:09:09 PM | | PART |
|
|
talked to the RP, will post project and sweep gutter,
|
MEC13-03095
| Pressure Test | 8/14/2013 | 8/15/2013 | 8/15/2013 3:35:35 PM | A | PASS |
|
|
april ###-#### ri 20# TEST OK
|
MEC13-03095
| Rough-in | 8/14/2013 | 8/15/2013 | 8/15/2013 3:35:02 PM | A | PASS |
|
|
april ###-#### ri 20# test ok
|
MEC12-02992
| Rough-in | 8/14/2013 | 8/15/2013 | 8/15/2013 3:34:32 PM | P | NR |
|
|
>> Inspection requested via web by Joe Bertwell needs better access
|
MEC13-01814
| Pressure Test | 8/14/2013 | 8/15/2013 | 8/15/2013 3:34:00 PM | P | PASS |
|
|
This pressure test is for the outdoor fire pit. Please call Jason @ ###-#### with any inspection issues. Phone #: ###-#### >> Inspection requested via web by Angie maguire 20# test ok
|
MEC12-03803
| Final | 8/15/2013 | 8/15/2013 | 8/15/2013 1:52:48 PM | P | PASS |
|
|
###-#### ###-####
|
PLM13-02175
| Final | 8/14/2013 | 8/15/2013 | 8/14/2013 4:28:41 PM | A | PASS |
|
|
8:00 am final ok with union at dcva
|