Inspections for the day of: Thursday, August 15, 2013.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00342 INSP-Sprinkler Rough-in8/15/20138/15/20138/15/2013 3:57:22 PMPPASS
Underground supply piping is ok to cover. 2" poly like the others.
BLD13-01294 FIRE-Final Inspection8/15/20138/15/20138/15/2013 3:20:02 PMPPASS
Life safety passed. Contractor to provide correct address prior to building sign off.
FIR13-00332 INSP-Sprinkler Rough-in8/15/20138/15/20138/15/2013 3:13:52 PMPPASS
Areas inspected and passed are the demo'd Starbucks and Pharmacy locations and the new Starbucks location. Areas dated and marked in red on the city approved plans.
FIR13-00278 INSP-Final Inspection8/15/20138/15/20138/15/2013 2:47:19 PMPPASS
Permit finaled
FIR13-00301 INSP-Final Inspection8/15/20138/15/20138/15/2013 2:46:08 PMPPASS
Permit finaled
BLD13-01008 FIRE-Final Inspection8/14/20138/15/20138/15/2013 2:43:05 PMPPASS
Life safety passed. All of the racks have been cut down/modified to be no taller than 8'-0"
FIR13-00135 INSP-Sprinkler Rough-in/Hydro8/15/20138/15/20138/15/2013 1:59:17 PMPPASS
Hydro test of the east system passed
BLD12-01399 FIRE-Final Inspection8/14/20138/15/20138/15/2013 12:15:28 PMAPASS
Life safety passed
FIR12-00177 INSP-Final Inspection8/14/20138/15/20138/15/2013 10:33:34 AMAPASS
permit finaled
FIR13-00037 INSP-Final Inspection8/14/20138/15/20138/15/2013 10:28:52 AMAPASS
Permit finaled
FIR12-00033 INSP-Final Inspection8/14/20138/15/20138/15/2013 10:27:39 AMAPASS
Permit finaled