FIR13-00342
| INSP-Sprinkler Rough-in | 8/15/2013 | 8/15/2013 | 8/15/2013 3:57:22 PM | P | PASS |
|
|
Underground supply piping is ok to cover. 2" poly like the others.
|
BLD13-01294
| FIRE-Final Inspection | 8/15/2013 | 8/15/2013 | 8/15/2013 3:20:02 PM | P | PASS |
|
|
Life safety passed. Contractor to provide correct address prior to building sign off.
|
FIR13-00332
| INSP-Sprinkler Rough-in | 8/15/2013 | 8/15/2013 | 8/15/2013 3:13:52 PM | P | PASS |
|
|
Areas inspected and passed are the demo'd Starbucks and Pharmacy locations and the new Starbucks location. Areas dated and marked in red on the city approved plans.
|
FIR13-00278
| INSP-Final Inspection | 8/15/2013 | 8/15/2013 | 8/15/2013 2:47:19 PM | P | PASS |
|
|
Permit finaled
|
FIR13-00301
| INSP-Final Inspection | 8/15/2013 | 8/15/2013 | 8/15/2013 2:46:08 PM | P | PASS |
|
|
Permit finaled
|
BLD13-01008
| FIRE-Final Inspection | 8/14/2013 | 8/15/2013 | 8/15/2013 2:43:05 PM | P | PASS |
|
|
Life safety passed. All of the racks have been cut down/modified to be no taller than 8'-0"
|
FIR13-00135
| INSP-Sprinkler Rough-in/Hydro | 8/15/2013 | 8/15/2013 | 8/15/2013 1:59:17 PM | P | PASS |
|
|
Hydro test of the east system passed
|
BLD12-01399
| FIRE-Final Inspection | 8/14/2013 | 8/15/2013 | 8/15/2013 12:15:28 PM | A | PASS |
|
|
Life safety passed
|
FIR12-00177
| INSP-Final Inspection | 8/14/2013 | 8/15/2013 | 8/15/2013 10:33:34 AM | A | PASS |
|
|
permit finaled
|
FIR13-00037
| INSP-Final Inspection | 8/14/2013 | 8/15/2013 | 8/15/2013 10:28:52 AM | A | PASS |
|
|
Permit finaled
|
FIR12-00033
| INSP-Final Inspection | 8/14/2013 | 8/15/2013 | 8/15/2013 10:27:39 AM | A | PASS |
|
|
Permit finaled
|