ESC14-00558
| Site Final | 8/15/2014 | 8/15/2014 | 8/15/2014 4:02:59 PM | P | PASS |
|
|
|
ESC14-00558
| DOC - Permit Finaled | 8/15/2014 | 8/15/2014 | 8/15/2014 4:02:40 PM | P | PASS |
|
|
|
BLD14-01666
| BLD-Final | 8/14/2014 | 8/15/2014 | 8/15/2014 4:02:28 PM | P | PASS |
|
|
mike Phone #: ###-####
|
BLD14-01666
| DOC - Permit Finaled | 8/15/2014 | 8/15/2014 | 8/15/2014 4:02:16 PM | P | PASS |
|
|
|
BLD14-01474
| BLD-Footing | 8/15/2014 | 8/15/2014 | 8/15/2014 4:01:22 PM | P | PASS |
|
|
before 3:30 // garage footing // Greg Phone #: ###-#### This should complete all footings.........except maybe some pads.
|
ESC14-00634
| Site Preparation | 8/15/2014 | 8/15/2014 | 8/15/2014 4:00:06 PM | P | PASS |
|
|
Brett
|
BLD14-01925
| BLD-Footing | 8/14/2014 | 8/15/2014 | 8/15/2014 4:00:03 PM | P | PASS |
|
|
John Phone #: ###-####
|
ESC14-00674
| Site Preparation | 8/15/2014 | 8/15/2014 | 8/15/2014 4:00:02 PM | P | PASS |
|
|
|
BLD14-02062
| BLD-Footing | 8/15/2014 | 8/15/2014 | 8/15/2014 4:00:02 PM | P | PASS |
|
|
JR Phone #: ###-####
|
BLD14-00992
| BLD-Energy code compliance | 8/14/2014 | 8/15/2014 | 8/15/2014 4:00:01 PM | A | PASS |
|
|
Mika Phone #: ###-####
|
BLD14-01399
| BLD-Framing/Rough-in | 8/14/2014 | 8/15/2014 | 8/15/2014 1:52:18 PM | A | PASS |
|
|
Framing/rough-in for Outdoor Structures before installing soffit. Phone #: ###-#### Inspection requested via web by greg bauer
|
BLD14-01611
| BLD-Framing/Rough-in | 8/13/2014 | 8/15/2014 | 8/15/2014 1:52:00 PM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Terry Torrence C/N posted....OK to insulate.
|
BLD14-01736
| BLD-Wall Bracing | 8/14/2014 | 8/15/2014 | 8/15/2014 10:28:33 AM | A | PASS |
|
|
colby Phone #: ###-####
|
GCB12-00156
| GCB-Framing | 8/14/2014 | 8/15/2014 | 8/15/2014 10:27:54 AM | A | PART |
|
|
###-#### Julio Verified installation of Tenmat FF109X fire rated light covers above can lights. Product approved by Sam Zahorka plan check.
|