BLD13-01792
| FIRE-Final Inspection | 8/12/2014 | 8/15/2014 | 8/19/2014 4:52:48 PM | A | PART |
|
|
Odie Phone #: ###-####-please give as much notice as possible so he can meet Phone #: ###-####
|
BLD13-01792
| FIRE-Final Inspection | 8/12/2014 | 8/15/2014 | 8/19/2014 4:52:33 PM | A | PART |
|
|
Odie Phone #: ###-####-please give as much notice as possible so he can meet Phone #: ###-####
|
BLD13-01793
| FIRE-Final Inspection | 8/12/2014 | 8/15/2014 | 8/19/2014 4:52:18 PM | A | PART |
|
|
Odie Phone #: ###-####
|
BLD13-00689
| FIRE-Final Inspection | 8/12/2014 | 8/15/2014 | 8/19/2014 4:51:59 PM | A | PART |
|
|
Odie Phone #: ###-####-please give as much notice as possible so he can meet
|
FIR14-00316
| INSP-Sprinkler Rough-in/Hydro | 8/14/2014 | 8/15/2014 | 8/15/2014 4:31:37 PM | A | PART |
|
|
Overhead hydrostatic testing passed. Need to provide plan modification to include field changes in branchline, main and sprinkler head locations and changes to type and number of sprinklers at several locations including the work room, kitchen, office, principal office, east classroom, music office, girls restroom, and storage closets.
|
FIR14-00260
| INSP-Final Inspection | 8/15/2014 | 8/15/2014 | 8/15/2014 4:20:10 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR14-00577
| INSP-Final Inspection | 8/15/2014 | 8/15/2014 | 8/15/2014 4:19:35 PM | P | PART |
|
|
Okay for cover at the main corridor ceiling.
|
FIR14-00277
| INSP-Sprinkler Rough-in/Hydro | 8/14/2014 | 8/15/2014 | 8/15/2014 3:56:12 PM | A | PART |
|
|
UG hydrostatic testing for both the remote FDC and the UG fire supply line completed satisfactory.
|
FIR13-00597
| INSP-Final Inspection | 8/14/2014 | 8/15/2014 | 8/15/2014 3:21:59 PM | A | PART |
|
|
Need to provide plan modification per inspection activity note dated 4/11/14.
|
FIR14-00204
| INSP-Final Inspection | 8/12/2014 | 8/15/2014 | 8/15/2014 3:20:28 PM | A | PART |
|
|
Items noted include; remove remainder of MP stations per the scope of work, new tamper switch supervision, remove remainder of old horns, clear obstructions at duct detector vent tubes, provide EOL testing for notification circuts on battery power. Duct detectors for unit shutdown tested okay.
|
FIR13-00533
| INSP-Final Inspection | 8/12/2014 | 8/15/2014 | 8/15/2014 3:14:26 PM | A | PART |
|
|
|
BLD14-01524
| FIRE-Final Inspection | 8/14/2014 | 8/15/2014 | 8/15/2014 3:12:34 PM | A | PASS |
|
|
Fire life safety finaled.
|
FIR14-00368
| INSP-Final Inspection | 8/15/2014 | 8/15/2014 | 8/15/2014 3:12:04 PM | P | PASS |
|
|
Scope of fire sprinkler work passed final walkthrough. Permit finaled.
|
FIR14-00123
| INSP-Final Inspection | 8/12/2014 | 8/15/2014 | 8/15/2014 3:11:22 PM | A | PASS |
|
|
Fire alarm permit finaled. Inspection passed.
|
FIR14-00062
| INSP-Final Inspection | 8/12/2014 | 8/15/2014 | 8/15/2014 3:10:33 PM | A | PASS |
|
|
Fire alarm work passed inspection. Permit finaled.
|
FIR14-00262
| INSP-Final Inspection | 8/12/2014 | 8/15/2014 | 8/15/2014 3:09:18 PM | A | PASS |
|
|
Inspection and functional testing passed. Fire alarm permit finaled.
|
FIR14-00263
| INSP-Final Inspection | 8/12/2014 | 8/15/2014 | 8/15/2014 3:08:03 PM | A | PASS |
|
|
Fire alarm work passed inspection.
|