Inspections for the day of: Friday, August 15, 2014.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-00203 BLD-Wall Bracing8/15/20148/15/20148/15/2014 3:33:11 PMPPASS
Richard Phone #: ###-####. floor to floor straps ok.
BLD14-00210 BLD-Wall Bracing8/15/20148/15/20148/15/2014 3:31:39 PMPPASS
Richard Phone #: ###-####. 1st. floor, interior and exterior shear walls ok.
BLD14-00211 BLD-Wall Bracing8/15/20148/15/20148/15/2014 3:30:49 PMPPASS
Richard Phone #: ###-####
BLD14-00212 BLD-Wall Bracing8/15/20148/15/20148/15/2014 3:29:49 PMPPASS
Richard Phone #: ###-####. exterior floor to floor straps ok.
BLD14-00209 BLD-Wall Bracing8/15/20148/15/20148/15/2014 3:28:44 PMPPASS
Richard Phone #: ###-####. Interior shear walls, 1st. floor.
BLD14-01507 BLD-Wall Bracing8/15/20148/15/20148/15/2014 3:05:26 PMPPASS
Pat Phone #: ###-####
BLD14-01235 BLD-Wall Bracing8/15/20148/15/20148/15/2014 3:05:09 PMPPASS
Pat Phone #: ###-####
BLD14-01508 BLD-Wall Bracing8/15/20148/15/20148/15/2014 3:04:48 PMPPASS
Pat Phone #: ###-####
BLD14-00420 BLD-Final8/14/20148/15/20148/15/2014 2:20:07 PMPPASS
Please sign off with Building Final

Doug ###-#### Phone #: ###-#### Inspection requested via web by Brian McCoy
BLD14-00420 DOC - Permit Finaled8/15/20148/15/20148/15/2014 2:19:57 PMPPASS
BLD14-00786 BLD-Final8/15/20148/15/20148/15/2014 2:19:39 PMPPASS
Doug Phone #: ###-####. ok for perm occ.
GCB14-00066 GCB-Final8/14/20148/15/20148/15/2014 9:55:28 AMAPASS
Joy ###-#### manufactured home stairs. structural final only ok.
GCB14-00082 GCB-Fndatn/slab ins/fld vent8/14/20148/15/20148/15/2014 9:38:22 AMAPASS
Jay ###-####
ESC14-00469 Site Preparation8/15/20148/15/20148/15/2014 9:13:31 AMAPASS
BLD14-01496 BLD-Footing8/14/20148/15/20148/15/2014 9:13:16 AMAPART
Footing Inspection for East portion of Building. MTI Scheduled for inspection @ 2 pm, concrete placement at 2:30 pm. Phone #: ###-#### Inspection requested via web by Rob Holtz. Work in progress on installing #10 vertical reinforcement for canopy, pending special inspection. Also reviewed all special inspection reports to date, ok.
BLD14-02298 BLD-Footing8/14/20148/15/20148/15/2014 8:37:33 AMAPASS
brett Phone #: ###-####