BLD15-03282
| BLD-Final | 8/15/2016 | 8/15/2016 | 8/15/2016 4:57:36 PM | P | NR |
|
|
Hanz Phone #: ###-####. Rescheduled for tomorrow. Neds to install handrails.
|
BLD14-03207
| BLD-Conference | 8/15/2016 | 8/15/2016 | 8/15/2016 4:56:26 PM | P | PART |
|
|
Daily inspection walk. Hannah out, call Adam when available, we can walk todays current needs. Thanks Much, ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson. 2hr. lid and walls for 2hr. corridor in kitchen, restroom hardlids in kitchen, Vapor barrier 4th floor exterior, stairway #4, 2hr. assembly at first landing, soffits 4th floor, hardlids 4th floor restrooms, 5th floor z channel at elevators.
|
BLD16-02915
| BLD-Conference | 8/15/2016 | 8/15/2016 | 8/15/2016 4:24:10 PM | P | DONE |
|
|
Inspection requested via web by Richard Murray
|
BLD16-02915
| DOC - Permit Finaled | 8/15/2016 | 8/15/2016 | 8/15/2016 4:23:12 PM | P | PASS |
|
|
|
BLD16-02360
| BLD-Ceiling Grid Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 4:21:31 PM | P | PASS |
|
|
Tony Phone #: ###-####
|
BLD16-01472
| BLD-Framing/Rough-in | 8/15/2016 | 8/15/2016 | 8/15/2016 2:31:40 PM | P | PASS |
|
|
Zack Phone #: ###-####. Interior steel stud framed walls for new mens and womens locker/restrooms in basement.
|
BLD16-00641
| BLD-Ceiling Grid Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 1:36:11 PM | P | PART |
|
|
Mark Phone #: ###-####. Ceiling grid ok. Pending other trades prior to cover.
|
BLD16-02323
| BLD-Wall Bracing | 8/12/2016 | 8/15/2016 | 8/15/2016 11:25:26 AM | A | PASS |
|
|
Modular classroom structural inspection- building blocking and skirt framing. Phone #: ###-#### Inspection requested via web by Gabe Beal
|
BLD16-01882
| BLD-Wall Bracing | 8/12/2016 | 8/15/2016 | 8/15/2016 10:09:11 AM | A | PASS |
|
|
Scott Phone #: ###-####
|
BLD16-02641
| BLD-Energy code compliance | 8/12/2016 | 8/15/2016 | 8/15/2016 9:21:33 AM | A | PASS |
|
|
Dan Phone #: ###-####
|
ESC16-00327
| Site Preparation | 8/15/2016 | 8/15/2016 | 8/15/2016 9:21:19 AM | A | PASS |
|
|
|
BLD16-00766
| BLD-Footing | 8/12/2016 | 8/15/2016 | 8/15/2016 9:21:03 AM | A | PASS |
|
|
Jan-rebar-pour time 2:30 Phone #: ###-####. column footings for canopy. Will have special inspection.
|
BLD16-01314
| BLD-Final | 8/15/2016 | 8/15/2016 | 8/15/2016 8:53:23 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Tracy Lee. Needs plumbing final.
|