Inspections for the day of: Monday, August 15, 2016.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-03282 BLD-Final8/15/20168/15/20168/15/2016 4:57:36 PMPNR
Hanz Phone #: ###-####. Rescheduled for tomorrow. Neds to install handrails.
BLD14-03207 BLD-Conference8/15/20168/15/20168/15/2016 4:56:26 PMPPART
Daily inspection walk. Hannah out, call Adam when available, we can walk todays current needs. Thanks Much, ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson. 2hr. lid and walls for 2hr. corridor in kitchen, restroom hardlids in kitchen, Vapor barrier 4th floor exterior, stairway #4, 2hr. assembly at first landing, soffits 4th floor, hardlids 4th floor restrooms, 5th floor z channel at elevators.

BLD16-02915 BLD-Conference8/15/20168/15/20168/15/2016 4:24:10 PMPDONE
Inspection requested via web by Richard Murray
BLD16-02915 DOC - Permit Finaled8/15/20168/15/20168/15/2016 4:23:12 PMPPASS
BLD16-02360 BLD-Ceiling Grid Inspection8/15/20168/15/20168/15/2016 4:21:31 PMPPASS
Tony Phone #: ###-####
BLD16-01472 BLD-Framing/Rough-in8/15/20168/15/20168/15/2016 2:31:40 PMPPASS
Zack Phone #: ###-####. Interior steel stud framed walls for new mens and womens locker/restrooms in basement.
BLD16-00641 BLD-Ceiling Grid Inspection8/15/20168/15/20168/15/2016 1:36:11 PMPPART
Mark Phone #: ###-####. Ceiling grid ok. Pending other trades prior to cover.
BLD16-02323 BLD-Wall Bracing8/12/20168/15/20168/15/2016 11:25:26 AMAPASS
Modular classroom structural inspection- building blocking and skirt framing. Phone #: ###-#### Inspection requested via web by Gabe Beal
BLD16-01882 BLD-Wall Bracing8/12/20168/15/20168/15/2016 10:09:11 AMAPASS
Scott Phone #: ###-####
BLD16-02641 BLD-Energy code compliance8/12/20168/15/20168/15/2016 9:21:33 AMAPASS
Dan Phone #: ###-####
ESC16-00327 Site Preparation8/15/20168/15/20168/15/2016 9:21:19 AMAPASS
BLD16-00766 BLD-Footing8/12/20168/15/20168/15/2016 9:21:03 AMAPASS
Jan-rebar-pour time 2:30 Phone #: ###-####. column footings for canopy. Will have special inspection.
BLD16-01314 BLD-Final8/15/20168/15/20168/15/2016 8:53:23 AMANR
Phone #: ###-#### Inspection requested via web by Tracy Lee. Needs plumbing final.