ESC15-01171
| Aging Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 4:11:02 PM | | PEND |
|
|
No activity culdesac has been swept not stabilized
|
ESC16-01075
| Complaint Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 2:34:51 PM | P | PEND |
|
|
A lot of dust, not much of being watered down to keep it under control
Contracted contractor to get a garden hose onsite to spray down area, especially the during the SFH Demo. he stated he will. Will follow up in a few days once Demo Portion Commences
|
ESC16-01007
| Site Preparation | 8/15/2016 | 8/15/2016 | 8/15/2016 2:00:25 PM | P | PASS |
|
|
You will not be able to get into the substation without an escort. If you need to get in we will need to make arrangements. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
--Permit posted on Substation. Approved for construction
|
ESC13-00524
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 1:20:07 PM | | PASS |
|
|
No ESC issues observed at this time
|
ESC15-00234
| Aging Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 11:13:56 AM | | FAIL |
|
|
remove temp BMP's (Silt Fence)
|
ESC16-00499
| BMP Violation | 8/12/2016 | 8/15/2016 | 8/15/2016 11:02:26 AM | A | FAIL |
|
|
Per EEJ Phone #: ###-####
Verbal correction notice to RP Charlie, to remove construction debris that laying all around the project, sweep sediment off sidewalk and install a BMP (straw waddle) along front of project. will follow up tomorrow to ensure compliance has been achieved.
|
ESC15-01343
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 10:42:14 AM | | PEND |
|
|
disturbed areas have been hydroseeded, but has not been established. No esc issues observed
|
ESC15-00963
| Aging Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 10:07:03 AM | | PASS |
|
|
|
ESC15-00963
| DOC - Permit Finaled | 8/15/2016 | 8/15/2016 | 8/15/2016 10:06:51 AM | P | PASS |
|
|
SFH is complete 100% re-vegitated/landscaped ESC conditions satisfied
|
ESC16-00215
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 9:55:10 AM | P | PASS |
|
|
|