BLD17-03581
| FIRE-Final Inspection | 8/14/2018 | 8/15/2018 | 8/15/2018 3:06:56 PM | A | FAIL |
|
|
FIre life safety will be ok to pass when the fire dept access signage is installed and the project related fire alarm, fire sprinkerl and hood suppression system permits are finaled.
Fire/Life/Safety Phone #: ###-#### Inspection requested via web by Mike McHargue
|
FIR18-00500
| INSP-Final Inspection | 8/14/2018 | 8/15/2018 | 8/15/2018 2:45:57 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Don Kartchner
|
FIR17-00364
| INSP-Final Inspection | 8/14/2018 | 8/15/2018 | 8/15/2018 1:54:00 PM | P | PASS |
|
|
Permit finaled
|
FIR17-00771
| INSP-Final Inspection | 8/13/2018 | 8/15/2018 | 8/15/2018 1:53:25 PM | A | CANC |
|
|
Johnathan Phone #: ###-####
|
FIR18-00327
| INSP-Sprinkler Rough-in | 8/15/2018 | 8/15/2018 | 8/15/2018 11:52:24 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered.
Should be done late morning. Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR18-00130
| INSP-Sprinkler Rough-in | 8/14/2018 | 8/15/2018 | 8/15/2018 11:29:54 AM | A | PASS |
|
|
Underground supply line piping is ok for cover.
Underground rough to cover. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00475
| INSP-Sprinkler Rough-in | 8/14/2018 | 8/15/2018 | 8/15/2018 11:20:11 AM | A | PASS |
|
|
The underground supply piping is ok for cover. Stan is going to send pictures of the conduit for the tamper switch prior to cover.
Phone #: ###-#### Inspection requested via web by Connie Danes
|
FIR18-00547
| INSP-Sprinkler Rough-in | 8/14/2018 | 8/15/2018 | 8/15/2018 9:21:40 AM | A | PASS |
|
|
Piping above the three hardlids is ok for cover.
Rick Phone #: ###-####
|
FIR18-00454
| INSP-Sprinkler Rough-in | 8/14/2018 | 8/15/2018 | 8/15/2018 7:28:48 AM | A | PASS |
|
|
Rough to cover passed. Heads relocated. Piping can be covered.
Phone #: ###-#### Inspection requested via web by Stan Beus
|