FIR18-00572
| INSP-Final Inspection | 8/15/2019 | 8/15/2019 | 8/15/2019 2:00:33 PM | P | CANC |
|
|
I have repeatedly called this contacts listed phone number and the message says it has been disconnected. I found shane's phone number and tried it and it has "calling restrictions". Can not make contact. No inspection performed.
4 if possible // Brandon Phone #: ###-####
|
BLD19-00290
| FIRE-Final Inspection | 8/14/2019 | 8/15/2019 | 8/15/2019 1:43:48 PM | P | FAIL |
|
|
Need a FIR permit for the new head in the gas closet. Need NFPA signage as discussed on the gas closet door. Need the gas closet manifold/piping certified. Brian Wilson ###-####
|
NAF19-00071
| INSP-Sprinkler Rough-in | 8/14/2019 | 8/15/2019 | 8/15/2019 1:42:19 PM | P | FAIL |
|
|
Tenting still needs modified in the bedroom with the soffit, insulation needs to be added at both sides of the two drops in this room to keep blow-in insulation out and heat in. Also the two 1" pipe risers that supply piping in the living room vaulted ceiling have been installed on the outside of the plywood. They have been insulated/tented vertically but when the owner insulates the wall it will effectively block off the transfer of heat. The pipe should be relocated to the inside of the wall and insulation placed behind the piping.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00606
| INSP-Final Inspection | 8/15/2019 | 8/15/2019 | 8/15/2019 1:30:48 PM | P | CANC |
|
|
Not ready for final.
Nate is the Contact Phone #: ###-#### Inspection requested via web by Chris Green
|
BLD18-00776
| FIRE-Final Inspection | 8/15/2019 | 8/15/2019 | 8/15/2019 1:30:11 PM | P | PART |
|
|
A temp for life safety is being given with Boise Fire approval until the project related fire alarm permit is finaled the exit discharge light is repaired and the fire hydrant issue is addressed.
Phone #: ###-####
|
FIR18-00882
| INSP-Final Inspection | 8/15/2019 | 8/15/2019 | 8/15/2019 1:25:25 PM | A | PASS |
|
|
Permit finaled
Please call Rick with time frame Phone #: ###-#### Inspection requested via web by Jeff Packham
|
FIR19-00379
| INSP-Final Inspection | 8/15/2019 | 8/15/2019 | 8/15/2019 12:10:00 PM | P | FAIL |
|
|
Per Jason with HC company this inspection was for phase 2 fire alarm work which this permit is titled in the scope of work. No approved plans or small documents were provided for this permit. The plans provided were for phase 1. Permits/inspections were not even scheduled. I noted overspaced devices and the requirement for atleast two additional devices in two Conference rooms. No testing performed.
|
FIR19-00606
| INSP-Sprinkler Rough-in | 8/15/2019 | 8/15/2019 | 8/15/2019 11:15:49 AM | P | PASS |
|
|
Rough-in passed. Piping can be covered.
Nate is the Contact Phone #: ###-#### Inspection requested via web by Chris Green
|
BLD18-02644
| FIRE-Final Inspection | 8/14/2019 | 8/15/2019 | 8/15/2019 9:53:47 AM | A | FAIL |
|
|
This life safety inspection was for Phase 2. The phase 2 fire sprinkler and fire alarm work needs to be completed. I noted exit signs missing and one area that needs the exit sign repaired and emergency lighting provided.. Also Jason agreed that an old aluminum door with a deadbolt will be removed.
Jason Phone #: ###-####
|
FIR18-00886
| INSP-Final Inspection | 8/14/2019 | 8/15/2019 | 8/15/2019 9:50:56 AM | A | FAIL |
|
|
Inspection was for completion of the phase 2 work. I noted one pendant overspaced in an office, one pendant too close to a wall in another office and one exam room where a standard esponce pendant had been left with a new quick responce pendant. HC Company is going to remove a door that is causing an obstruction in a corridor.
Contact Hunter Anderson ###-#### 30 min prior to Final Insp of Phase 2 start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|