PLM4027064
| INSP - Conference | 8/16/1995 | 8/16/1995 | 8/16/1995 12:00:00 AM | | PASS |
|
|
CONFERENCE ON ROUGH-IN; PREVIOUS 1/2" SERVICE OK, DRAINA GE FITTINGS OK'D FOR USE AS INSTALLED, WILL RAISE W/L'S IN SOFETT TO PROTECT FROM FREEZING.
|
PLM4047510
| INSP - Final | 8/16/1995 | 8/16/1995 | 8/16/1995 12:00:00 AM | | PART |
|
|
/ / 330 - correction: perm. attached ladder required to access wh, set temp occ ok
|
PLM95-00504
| INSP - Sprinkler & Backflow | 8/16/1995 | 8/16/1995 | 8/16/1995 12:00:00 AM | | PART |
|
|
/ / 330 - partial sp ok tie in only
|
PLM95-00622
| INSP - Sprinkler & Backflow | 8/16/1995 | 8/16/1995 | 8/16/1995 12:00:00 AM | | PASS |
|
|
/ / 330 - final ok
|
PLM95-00631
| INSP - Framing/ Rough-in | 8/16/1995 | 8/16/1995 | 8/16/1995 12:00:00 AM | P | PASS |
|
|
08/16/95 330 - r/i ok 2-wc,3-lav,1-tub,1-sh,1-si,1-wb,1-wh.
|