BLD01-02970
| BLD-Conference | 8/15/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | A | PASS |
|
|
###-#### DAVE met w/ bldr & Advanced Htg. (Gary)...ok to box out duct work over stairs if 1hr enclosure; exposed spiral duct at proposed 2nd fl.corridor ok if not serving corr. & sealed to SMACNA stds. 8/16/2002 11:14:24 AM
|
BLD02-01623
| BLD-Framing/Rough-in | 8/15/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | A | PART |
|
|
###-####, roof frame looks ok per eng'd plan...have eng's ok for final. 8/16/2002 10:31:50 AM
|
BLD02-01696
| BLD-Conference | 8/16/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | A | PASS |
|
|
w/Mike Otto re scope of work & spray on fireproofing protective coating....met w/ Scott Apple at Ymca.
|
BLD02-01697
| BLD-Conference | 8/16/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | A | PASS |
|
|
w/ Scott Apple at Ymca....consult w/ Rick J. re sprinkler locations; recommend remove mesh added at webs as may obstruct sprinklers.
|
BLD02-01752
| BLD-Framing/Rough-in | 8/15/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | P | CANC |
|
|
###-####
|
BLD02-01752
| BLD-Framing/Rough-in | 8/15/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | P | PART |
|
|
###-####, shear nailing ok 8/16/2002 5:32:01 PM
|
BLD01-00011
| BLD-Final | 8/16/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | P | NR |
|
|
DARRELL; Phone #: ###-####
|
BLD01-00808
| BLD-Final | 8/16/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | P | CANC |
|
|
DARRELL; Phone #: ###-####
|
BLD01-00809
| BLD-Final | 8/16/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | P | CANC |
|
|
DARRELL; Phone #: ###-####
|
BLD02-00259
| BLD-Framing/Rough-in | 8/16/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | P | FAIL |
|
|
###-####, c/n, verify damper operation, pach lid, add wires & pods at grid....ok to tile except where noted. 8/16/2002 3:31:39 PM
|