PLM02-01655
| Final | 8/15/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-02542
| Plumbing Rough-in | 8/15/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | A | PASS |
|
|
###-#### KEN SMART
|
PLM02-01950
| Final | 8/15/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | A | PASS |
|
|
###-#### lockbox 139
|
PLM02-02546
| Plumbing Rough-in | 8/16/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | P | PART |
|
|
###-#### bathroom area,s on northwest side of 5th floor of south tower under floor drain,s test ok 8/16/2002 4:32:01 PM
|
PLM02-01882
| Groundwork | 8/15/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/15/2002 at 14:19:39. Contact: ###-####. planter drain area for floor drain,s test ok ok to cover 8/16/2002 3:38:36 PM
|